ight to all of the surface damage provisions applying to Federal and State<br />

government lands. (Radue)<br />

Landowners must be protected and fairly paid for surface rights, damage, and<br />

loss of use. (Orr)<br />

• I support the following change to the eminent domain.<br />

Mitigates the damage to private. property that eminent domain causes.<br />

Landowners must have more rights to be more involved in the routing of<br />

projects across their land and should have the right to require ,the same<br />

rnitigations the government includes on state and federal lands.<br />

(Marcure)<br />

I support eminent domain reform. I suggest the subcommittee immediately<br />

draft legislation which does the following:<br />

Mitigates the damage to private property that eminent domain causes.<br />

Landowners must be more involved in the routing of projects across their<br />

land and should have the same right to require the same mitigations ,the<br />

gov't includes on state and federal land.<br />

Requires the company putting in the project to repair and do all<br />

reclamation work completely before using the pipeline, power line, etc.<br />

In our case once the pipe was laid Cenex showed little desire to properly<br />

repair the right-of-way.<br />

Requires that the company be required by law to notify the landowner<br />

immediately (within 24 hours) of any damage to the landowners property,<br />

crops, livestock, etc. On our ranch a power line fell down at our summer<br />

pasture (20 miles away) killing a cow and starting a range fire. The<br />

power company knew about it right a way, but we would probably not<br />

known about it for a few days if a neighbor had not phoned us. Other<br />

times utility crews have severely rutted up grain and hay fields without<br />

notifying us.<br />

Requires that the company pay full restitution within 30 days for any<br />

damage due to their project.<br />

Requires that the company or gov't entity control all weeds on the rightof-way<br />

forever. On our ranch we probably spend more in a year or 2<br />

controlling weeds on the 4 missile lines through our ranch than we<br />

received total for them coming through.<br />

EQC Eminent Domain Study -27-