all man-days related to the<br />
operation (e.g. including<br />
also time spent in travel and<br />
idle time).<br />
Average<br />
operational<br />
days ratio (TE)<br />
EFF-<br />
AVG_OPDAYS_TE<br />
“To what extent are the<br />
available TE resources<br />
(allocated to the operation)<br />
utilized for direct<br />
operational activities” This<br />
is shown by comparing the<br />
number of operational days<br />
of TE (spent for<br />
implementation of the<br />
operation) to the number of<br />
all days of TE related to the<br />
operation (e.g. including<br />
also time spent in transport<br />
and idle time).<br />
80 – 85 %<br />
External data<br />
contribution<br />
timeliness and<br />
quality ratio<br />
EFF-EX_CTRB<br />
“To what extent is data<br />
input received by <strong>Frontex</strong> on<br />
time” This is measured by<br />
percentage of data<br />
contributions received on<br />
time, with acceptable level<br />
of completeness and quality.<br />
85 %<br />
Operations plan<br />
implementation<br />
ratio (HR)<br />
EFF-OP_PLAN_HR<br />
Assess the effectiveness of<br />
Joint Operations planning in<br />
the area of human resources<br />
(HR) utilization by outlining<br />
the difference between HR<br />
deployment plans (in mandays,<br />
according to the raised<br />
JO needs) with the<br />
implementation.<br />
98 %<br />
Operations plan<br />
implementation<br />
ratio (TE)<br />
EFF-OP_PLAN_TE<br />
Assess the effectiveness of<br />
Joint Operations planning in<br />
the area of technical<br />
equipment (TE) utilization<br />
by outlining the difference<br />
between TE deployment<br />
plans (in operational days,<br />
according to the raised JO<br />
95 %<br />
Page 136 of 142