Coordination<br />

to<br />

Build Capacity<br />

2.1.2. Prioritization - Methodology<br />

End-users and those paying for delivery need to have reasonable expectations and confidence<br />

that the deliverables will satisfy their expectations. During the design phase of <strong>Frontex</strong><br />

products and services portfolio, reflected in the <strong>Frontex</strong> Programme of Work, different<br />

requirements, based on risk analysis and customers’ needs, had to be balanced. It is<br />

understood that expectations can shift as situations develop and threats materialize.<br />

In May 2012 a corporate planning meeting was held with 20 MS, 3 SAC and the COM<br />

participating. Prior to and during the meeting 13 , information on MSs’ national priorities and<br />

updated preferences, for specific projects, products and services, were collected. This<br />

information, and the outcome of the meeting, in conjunction with ongoing developments, was<br />

used to fine tune the Draft Programme of Work 2013 towards its adoption in September 2012.<br />

Within the portfolios and programmes <strong>Frontex</strong> will continue to prioritize activities.<br />

Short term<br />

respond to emergent needs<br />

Long term<br />

sustain operational presence in areas at<br />

external borders where there is<br />

constant high pressure<br />

maintain the ‘status quo’<br />

maintain core infrastructure for<br />

operational cooperation<br />

It is important to highlight that the terms used in the matrix should not purely be understood<br />

in their operational but also in their capacity building dimension.<br />

The dark shading shows high priorities (critical), medium priorities (urgent) are in medium<br />

grey and low priorities (important) are shaded in light grey. In applying the shading to<br />

deliverables and activities financed from Article 3 (excluding 35-Miscelaneaous) the following<br />

overview was generated:<br />

Priority Level (assigned) Financial Resources (M Euros) Human Resources<br />

HIGH – CRITICAL 42.5 89<br />

MEDIUM – URGENT 10.8 112<br />

LOW - IMPORTANT 1.0 4<br />

13 19 Member States and Schengen Associated Countries replied to the questionnaire distributed<br />