Download PDF - Frontex
Download PDF - Frontex
Download PDF - Frontex
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
functioning;<br />
To fully implement and<br />
evaluate the SGO mechanism;<br />
To evaluate and assess the<br />
operational usefulness of the<br />
current profiles as adopted by<br />
the Management Board (MB<br />
decision 11/2012 of 23 May<br />
2012)<br />
PRU 2<br />
Development<br />
and<br />
management of<br />
the Technical<br />
Equipment Pool<br />
(TEP)<br />
To enhance <strong>Frontex</strong> operational<br />
capacity by maintaining a high<br />
quality TEP and to manage the<br />
deployment of resources from<br />
the pool.<br />
To maintain the TEP data base;<br />
To manage the deployment of<br />
the equipment from the TEP by<br />
using of OPERA application;<br />
To maintain high level of<br />
availability of the equipment<br />
from the pool by regular<br />
communication with the<br />
contributing MSs;<br />
To implement <strong>Frontex</strong><br />
reporting obligations as regard<br />
of the deployed technical<br />
equipment and the MS<br />
contributions to the TEP.<br />
PA_POOL_UTL_TE<br />
EFF_OP_PLAN_TE(90)<br />
1,5<br />
PRU 3<br />
Pilot Project on<br />
lease of a<br />
service for<br />
border<br />
surveillance<br />
To lease a limited service for<br />
border surveillance for limited<br />
period of time and for a specific<br />
operation.<br />
To build on <strong>Frontex</strong> own<br />
operational capacity;<br />
To prove the cost efficiency of<br />
leasing of surveillance<br />
equipment;<br />
To establish the basis for<br />
further acquisition of<br />
surveillance equipment or<br />
surveillance services.<br />
EFF-QUA (3.8-4.2) 1.5<br />
300 000<br />
Page 76 of 142