04.01.2015 Views

Download PDF - Frontex

Download PDF - Frontex

Download PDF - Frontex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ART. SUBJECT TIMELINE<br />

15a HQ Agreement Q1 8<br />

17.4<br />

20.2<br />

(i)<br />

2.1 (i)<br />

5<br />

Implementing measures in agreement with COM pursuant to the<br />

arrangements provided for in article 110 of the Staff Regulation<br />

Agency’s Multi Annual Plan outlining the future long term strategy<br />

Provide necessary assistance to the development and operation of<br />

EUROSUR<br />

Establish an exchange programme for national border guards<br />

participating in the EBGT<br />

On a needs basis<br />

Q3<br />

2012 onwards<br />

Q2<br />

For a more detailed scanning, focusing on other political, economical, social, technical,<br />

environmental, and legal issues directly or indirectly impacting on <strong>Frontex</strong>’ societal and task<br />

environment, other documents such as the ARA 2012, SARA 2011, or FRAN quarterlies may be<br />

consulted.<br />

1.6.3. Eurosur<br />

The EUROSUR regulation is scheduled to enter into force on 1 October 2013, establishing a<br />

framework for information sharing and improving situational awareness and reaction<br />

capabilities. The EUROSUR network has been in use for the exchange of operational<br />

information since the end of 2011 and the number of connected MSs, as well as the scope of<br />

the provided services, has steadily increased.<br />

In 2013 the <strong>Frontex</strong> EUROSUR Programme will continue to prepare <strong>Frontex</strong> and the Member<br />

States for the entry into force of the Regulation. The Network will be enhanced and expanded<br />

to all Member States, the common surveillance tools will be tested and evaluated, and the<br />

European Situational Picture, as well as the Common Pre-Frontier Intelligence Picture, will be<br />

further developed. Overall, EUROSUR will form an increasingly important framework for<br />

<strong>Frontex</strong> operational activities.<br />

<strong>Frontex</strong> will ensure that the investments bring the expected benefits for the Member States.<br />

Internal reallocations of resources and the realignment of activities will enable <strong>Frontex</strong> to<br />

provide many of the services already from 1 October 2013. However, to fully implement all<br />

parts of the Regulation (e.g. full services on a 24/7 basis, comprehensive services regarding<br />

the common surveillance tools and operational management) will require additional resources<br />

and shall reach beyond 2013.<br />

8 Dependent on the hosting MS, the negotiations have to be launched and finalized<br />

Page 16 of 142

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!