04.01.2015 Views

Download PDF - Frontex

Download PDF - Frontex

Download PDF - Frontex

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

2.3.1. Operations Division<br />

Within the Operations Division and administrative tool (‘centralized reserve’) is implemented. In absence of a budget reserve this reserve consisting of<br />

earmarked amount (on average 10% per unit of the division)<br />

FTE<br />

Financial Means<br />

2012 14 2013 2012 (N3) 2013<br />

Division Management<br />

(10% of units’ budget earmarked)<br />

3 3 2,050.000 150.000<br />

(4,470.000)<br />

Joint Operations 74 74 42,493.000 41,739.000<br />

(4,200.000)<br />

Risk Analysis 48 49 1,358.660 1,445.000<br />

(140,000)<br />

<strong>Frontex</strong> Situation Centre 26 27 1,175.000 1,380.000<br />

(130,000)<br />

151 15 153 16 47,076.660 44,714.000<br />

(4,470.000)<br />

14 Figures on the basis of OPD contribution to SPP 2012-2014<br />

15 The figure on staff members include 4 FISOs not included in the establishment plan<br />

16 The figure on staff members include 4 FISOs not included in the establishment plan<br />

Page 35 of 142

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!