Download PDF - Frontex
Download PDF - Frontex
Download PDF - Frontex
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
2.3.1. Operations Division<br />
Within the Operations Division and administrative tool (‘centralized reserve’) is implemented. In absence of a budget reserve this reserve consisting of<br />
earmarked amount (on average 10% per unit of the division)<br />
FTE<br />
Financial Means<br />
2012 14 2013 2012 (N3) 2013<br />
Division Management<br />
(10% of units’ budget earmarked)<br />
3 3 2,050.000 150.000<br />
(4,470.000)<br />
Joint Operations 74 74 42,493.000 41,739.000<br />
(4,200.000)<br />
Risk Analysis 48 49 1,358.660 1,445.000<br />
(140,000)<br />
<strong>Frontex</strong> Situation Centre 26 27 1,175.000 1,380.000<br />
(130,000)<br />
151 15 153 16 47,076.660 44,714.000<br />
(4,470.000)<br />
14 Figures on the basis of OPD contribution to SPP 2012-2014<br />
15 The figure on staff members include 4 FISOs not included in the establishment plan<br />
16 The figure on staff members include 4 FISOs not included in the establishment plan<br />
Page 35 of 142