1.13 Provision Of Temporary Supply<br />

Temporary supply can be installed for a period of 6 months. Supply is intended for purposes of electric supply for<br />

temporary work site, festivals and celebrations. The applicant shall provide a suitable corridor for installation of<br />

supply mains and site for metering point. The meter will be installed at a meter board provided by the applicant.<br />

The Electrical Contractor shall test the installation.<br />

If the requirement exceeds 6 months, the approval shall be subject to availability of supply<br />

Application for temporary supply shall be separately submitted, stating the load requirements. The applicant<br />

will be charged full cost and according to the appropriate tariff plus an additional 33% surcharge on the total<br />

monthly bill.<br />

1.14 Single Tenant Premises<br />

If the supply is for a single tenant only (the owner, the developer or the landlord) then the entire supply will<br />

be metered at the applicant’s incoming switchboard. The consumption will be charged at the appropriate tariff<br />

rates.<br />

1.15 Multi Tenanted Premises<br />

If the supply is for multi tenanted premises where part of the supply is intended for the owner, developer or<br />

landlord, and the rest for the tenants in the building, the landlord’s supply and each of the tenant’s supplies will<br />

be separately metered and billed by TNB.<br />

The owner, developer, or landlord shall provide, own, maintain and repair at his own expense the electrical<br />

systems in the buildings including adequate and necessary rising and lateral mains. The design, installation and<br />

operating of such electrical systems shall comply with requirements of all the relevant authorities including the<br />

Energy Commission’s and TNB’s.<br />

1.16 Turnkey Projects<br />

In certain cases, the applicant may apply to undertake the planning and installation of the electrical systems<br />

(including overhead lines, switchgears, cables, based on TNB’s specifications and requirements) with the<br />

assistance of Electrical Consultant Engineer(s) and Electrical Contractor(s). Under the ‘turnkey’ concept the<br />

applicant will then hand over the entire electrical system to TNB. A separate discussion on this will have to be<br />

conducted with TNB.<br />

1.17 Connection Charges<br />

Please refer to the Statement of Connection Charges booklet available at the Kedai <strong>Tenaga</strong>. The booklet is<br />

subjected to change as may be published from time to time.<br />