Stage<br />

3 Joint Meeting<br />

Description<br />

TNB will restudy the amendments and arrange for a joint meeting with the Electrical Consultant Engineer<br />

for final acceptance of the technical requirements. Activities of both parties will be recorded in the Joint<br />

Meeting Action Log as in Appendix 9.<br />

4 Connection Charges<br />

TNB will issue a Notice of Connection Charges to the Electrical Consultant Engineer as per Appendix 10.<br />

5 Electricity Infrastructure Agreement (Optional)<br />

The applicant may decide to enter into an Electricity Infrastructure Agreement with TNB with regard to<br />

TNB scope of work, charges and timely connection.<br />

6 Discussion And Preparation Of Site Work<br />

After payment of connection charges, the Electrical Consultant Engineer will arrange for pre start work<br />

discussion and site and substation building hand over.<br />

7 Construction Completion And Substation Energising<br />

TNB will manage the construction work and is responsible for the commissioning of substations. The<br />

energising of supply by TNB will normally be done at the same time as the installation of the meters. For<br />

HV supply, the supply shall be energised in the presence of the Electrical Consultant Engineer and for LV<br />

consumers in the presence of the Electrical Contractor.<br />

8 Supply Application By The Electrical Contractor<br />

The Consultant Engineer advises the Electrical Contractor to submit supply application for load requirement<br />

up to 100kVA, normally for individual applicant. The process is the same as outlined in Section 2.<br />

3.4 What The Applicant Should Do<br />

The applicant should take the following action in applying for supply application for load exceeding<br />

100KVA.<br />

Steps Action Reference<br />

1 • Appoint one () Electrical Consultant Engineer for each supply application<br />

Appendix 11<br />

• Submit an appointment letter of the Electrical Consultant Engineer allowing him<br />

to act on behalf of the applicant to TNB.<br />