v. The panel cover and metal plate with TNB’s meter(s) mounted thereon shall be able to swing or open<br />

out for at least one right angle i.e. 90 o .<br />

vi.<br />

vii.<br />

The meter panel cover and metal plate shall have at least two metal hinges.<br />

Appropriate bushing shall be provided in all openings/ holes for the meter wiring.<br />

5.3 LVCT Metering Installation Requirements<br />

i. The height from the ground to the top of the meter panel shall not exceed 1.8 meters.<br />

ii.<br />

iii.<br />

iv.<br />

The switchboard shall be completed with all its components and accessories installed, and shall be<br />

mounted securely in its final position before the TNB’s meter(s) can be installed.<br />

There shall be working space of 1 m in front of the meter panel for the meter installation and meter<br />

reading. In the case of meter cubicle, there shall be working space of 1 m all round the cubicle.<br />

A 12 core 2.5 mm 2 or 4 mm 2 steel wire armoured cable shall be provided between the meter panel and<br />

current transformers and voltage source. The armoured cable shall not be buried or enclosed<br />

v. A 6.0 mm tap-hole plus screw/washer shall be provided on each busbar to facilitate connection of the<br />

voltage supply to the meter voltage coils.<br />

5.4 Mounting of Metering LVCTs<br />

i. Current transformers shall be mounted on incoming busbar for easy installation, removal or replacement,<br />

where necessary.<br />

ii.<br />

iii.<br />

iv.<br />

Proper bakelite clamps shall be provided to secure the metering current transformers in position.<br />

Adequate insulation shall be provided between the metering current transformers and the busbar.<br />

Where the incoming supply is controlled by a circuit breaker in consumer’s main switchboard, the<br />

metering CTs shall be installed before the circuit breaker and the meter voltage connections made.<br />

v. A two leaf door provided with hasp for locking facility shall be used to close the CT chamber.<br />

vi.<br />

There shall be working space of minimum 1 m from the back of the switchboard to the wall for<br />

installation of metering current transformers.<br />