(ii)<br />

TNB upon receiving the above study and other necessary data shall conduct an integrated study of the<br />

interconnected systems. The scope of study will include load flow, short-circuit, stability and protection<br />

coordination studies. The costs of this study will also be borne by the owner of generator seeking<br />

interconnection with the distribution system.<br />

1.2 OTHER INFORMATION REQUIREMENTS<br />

Other sets of information as listed below are necessary for TNBD to plan for connection of supply to consumers.<br />

1. Site plan or location plan (see Appendix ) indicating the geographical position of the premises/buildings<br />

of consumers. This information is essential for TNB to locate TNB’s infrastructure nearest to the prospective<br />

consumers.<br />

2. Layout plan (see Appendix ) for developed/proposed development. This information is necessary for TNB to<br />

locate sub-station locations, if not previously identified, and feeder routes for MV or LV networks. Sketched layout<br />

plans are required for individual or group applications less than 100KVA. Additional information, which needs to<br />

be specified in the supply application form, is the position of prospective consumer with respect to LV system or<br />

sub-station in terms of distance and estimated number of spans of LV feeders.<br />

3. Building layout plans are particularly useful for indicating services entrance location/positions, position of substations<br />

and consumer switch rooms.<br />

4. Sub-station layout plan for both sub-stations integrated into a building or in separate building.<br />

5. Consumer switch room layout indicating location of main switchboard, service cable entry position and necessary<br />

ducting or trenching.<br />

6. Wiring diagrams of installation to be approved and endorsed by Electrical Consultant Engineer for demand greater<br />

than 100kVA. The single line drawing of the installation must encompass the complete installations indicating<br />

incoming switches, main and sub-switchboards, main protection for incoming TNB supply as well as sub-circuit<br />

protection, metering schemes, conductor sizes, major equipment e.g motors etc., standby generators, capacitor<br />

banks. Ratings of switchgears and components must also be indicated.<br />

7. Appendix 14 is the form which registers the consent or acknowledgement of developer/owner for leasing/transfer<br />

of sub-station lot to TNB. This form is to be submitted by Electrical Consulting Engineers, acting on behalf of<br />

consumers, for projects requiring substations.<br />

Appendix 6 is a checklist for reference to consumers, electrical contractors and consultant engineers on range data<br />

or information required at the supply application processing stage.<br />