Table Z: Planning Levels for Harmonic Voltages in TNB distribution systems 415V and below including<br />
background harmonics<br />
Odd Harmonics<br />
Odd Harmonics<br />
(Non-multiple of 3)<br />
(Multiple of 3)<br />
Even Harmonics<br />
Order Harmonic Order Harmonic Order Harmonic<br />
“h” Voltage (%) “h” Voltage (%) “h” Voltage (%)<br />
5<br />
4.0<br />
7<br />
4.0<br />
2 1.6<br />
11<br />
3.0<br />
3<br />
4.0 4 1.0<br />
13<br />
2.5<br />
9<br />
1.2 6 0.5<br />
17<br />
1.6<br />
15<br />
0.3 8 0.4<br />
19<br />
1.2<br />
21<br />
0.2 10 0.4<br />
23<br />
1.2 >21 0.2 12 0.2<br />
25<br />
0.7<br />
>12 0.2<br />
>25 0.2+0.5(25/h)<br />
The total voltage harmonic distortion level is 5%<br />
Note: The above table shows the Engineering Recommendation G5/4 levels. TNB is in the process of adopting<br />
IEC levels and the values in the above table will be updated later<br />
2.3.7 Voltage Unbalance<br />
2.3.7.1 All plant and equipment connected to the distribution system, and that part of the distribution system at each<br />
connection site, should be capable of withstanding the following distortions of the voltage waveform in respect<br />
of Voltage Unbalance at the planning stage.<br />
) Under planned outage conditions, the maximum negative phase sequence component of the phase voltage<br />
on the distribution system should remain below 1% unless abnormal conditions prevail.<br />
) Under the planned outage conditions, infrequent short duration peaks with a maximum value of 2% are<br />
permitted for Voltage Unbalance, subject to the prior agreement of TNB under the connection agreement.<br />
TNB will only agree following a specific assessment of the impact of these levels on TNB and other<br />
Customers’ plant and equipment with which it is satisfied.<br />