Protection<br />
Protection Apparatus<br />
Protection System<br />
Prudent Utility Practices<br />
Reactive Energy<br />
Reactive Power<br />
Reliability<br />
Security<br />
Security of Supply<br />
Single Contingency<br />
Substation<br />
The provisions for detecting abnormal conditions on a system and initiating<br />
fault clearance or actuating signals or indications.<br />
A group of one or more protection relays and/or logic elements designated<br />
to perform a specified protection function.<br />
A system, which includes equipment, used to protect facilities from damage<br />
due to an electrical or mechanical fault or due to certain conditions of the<br />
power system.<br />
With respect to the distributor, means the exercise of that degree of skills,<br />
diligence, prudence and foresight consistent with Electricity Supply Act<br />
1990 and the Regulations, condition of Licence, standards, the Code and<br />
the distributor owned standards and practices.<br />
A measure, in varhours (varh) of the alternating exchange of stored energy<br />
in inductors and capacitors, which is the time-integral of the product of<br />
voltage and the out-of-phase component of current flow across a connection<br />
point.<br />
The product of voltage and current and the sine of the phase angle between<br />
them measured in units of volt amperes reactive. The rate at which reactive<br />
energy is transferred.<br />
In the context of a distribution system is a measure of availability of<br />
Adequate and secure supply to the consumers<br />
Means security Supply.<br />
The ability of the distribution system restore supply to consumers following<br />
momentary or temporary interruptions.<br />
In respect of a transmission or distribution network, a sequence of related<br />
Events which result in the removal from service of one transmission or<br />
distribution line, or transformer. The sequence of Events may include the<br />
application and clearance of a fault of defined severity.<br />
A facility at which two or more lines are switched for operational purposes.<br />
May include one or more transformers so that some connected lines operate<br />
at different nominal voltages to others.<br />