Where it is necessary to terminate the service line in a position outside the premise and exposed to the<br />

weather, prior approval shall be obtained for such a location from TNB Distribution Division Local<br />

Office.<br />

For domestic consumers, the meter shall be located at the premises and it is recommended that the meter<br />

shall be placed at the gate post.<br />

Other than domestic consumers, the meter that is located outside the premises shall be in a weather<br />

proof and ventilated panel/area which is suitable for meter installation and meter reading.<br />

v. Group metering for multi tenanted consumers or open commercial outlets shall be addressed in Section<br />

4.0<br />

vi.<br />

vii.<br />

The installation of the meter board in kitchens, bedrooms, bathrooms, utility rooms and in location<br />

injurious to the metering equipment or to the safety of personnel shall not be permitted, e.g. above a<br />

cooker point, hot rooms, below the opening for rising mains, directly in a riser duct, over a trunking or<br />

stairways, etc.<br />

Meter and their accessories should be installed only in clean and dry location not exposed to the<br />

weather or mechanical injury, free from vibration and not expose to direct sunlight and rain.viii.<br />

2.3 Height Of Meter Position<br />

i. The height of the meter board in the consumer’s premise at the wall facing the main entrance shall be<br />

1.75m (top of the meter) above ground level.<br />

ii.<br />

iii.<br />

The height of the meter board at the gate post shall be between minimum 1.0m and 1.5m above ground<br />

level.<br />

For other cases, the height of meter position shall be at maximum of 1.75m (top of the meter).<br />

2.4 Meter Board<br />

i. The meter board shall be:<br />

• Any hard wood chemically treated against attack by termites (Plywood is NOT to be used).<br />

• Any new material shall be subjected to SIRIM’s approval for non-hygroscopic, non-ignitable, ultra<br />

violet stabilized and distortion free under high outdoor temperature as well as subject to TNB’s<br />

prior approval.<br />

• Meter board other than wood shall be transparent.<br />