Table 2-4: Short-circuit levels for various voltage levels<br />
Supply Voltage Level S.C Rating<br />
275kV 40 kA for 3s<br />
132kV 31.5 kA for 3s<br />
33kV 25 kA for 3s<br />
22kV & 11kV 20 kA for 3s<br />
6.6 kV 20 kA for 3s<br />
415V & 240V 31.5 kA for 3s<br />
2.5 PROTECTION REQUIREMENTS<br />
2.5.1 Basic Requirements<br />
In all cases, the basic requirement is that the consumer’s arrangements for protection at the connection point, including<br />
types of equipment and protection settings, must be compatible with standard practices on the TNB’s system, and be as<br />
TNB specifies during the application for supply process. This is especially critical for MV and HV consumers.<br />
2.5.2 Specific Requirements<br />
Consumers shall take into consideration the following specific protection practices of TNB in designing their<br />
installation:<br />
(a)<br />
(b)<br />
(c)<br />
Maximum clearance times (from fault current inception to fault clearing) must be within the limits established<br />
TNB in their short circuit rating policy for the distribution system.<br />
Auto-reclosing or sequential switching features may be used on TNB’s distribution system. TNB will provide<br />
details on the operating sequence utilised for the supplies on the proposed installation so the consumer can plan<br />
for this in the design and protection of his facility.<br />
On some of TNB’s distribution systems, certain types of faults may cause disconnection of one phase only of a<br />
three-phase supply.<br />