5.0 LVCT METERING<br />
LV consumers taking more than 100A per phase shall require current transformers for the metering scheme.<br />
5.1 Location Of Meter Position<br />
i. The Electrical Consultant Engineer / Electrical Contractor is required to arrange for a suitable space for<br />
the metering installation on a panel/cubicle separate from the main switchboard.<br />
ii.<br />
iii.<br />
The position of the meter panel/cubicle shall be determined by the type of LV supply. The final metering<br />
position shall be decided by TNB.<br />
Consumers whose supplies are coming from a substation (load>800A) shall have the meter panel/<br />
cubicle preferably installed inside TNB substation.<br />
iv. The maximum distance of the cable from the CTs to the meter panel allowable is shown in Table 1<br />
below. Prior approval for location of the metering panel shall first be obtained from TNB.<br />
Table 1<br />
CT Burden<br />
VA<br />
Secondary Rated<br />
Current<br />
A<br />
Cross Connection of<br />
Conductor<br />
mm2<br />
Maximum Distance<br />
Allowable<br />
m<br />
7.5<br />
7.5<br />
5<br />
5<br />
2.5<br />
4.0<br />
12.0<br />
20.0<br />
Where meter burden for current circuit is: L.V. = 0.5 VA/ph<br />
5.2 Meter Panel Requirement<br />
i. The meter panel shall be of mild steel or other approved material, and of a thickness not less than<br />
1.5mm.<br />
ii. The meter panel for single feeder metering shall be detachable and as illustrated in Appendix 29,<br />
Drawing No. 6A and 6B.<br />
iii.<br />
iv.<br />
For multi-feeder metering, separate meter panels are to be used for each feeder.<br />
Provisions shall be made for sealing of the meter panel/cubicle.<br />