2.0 SUPPLY APPLICATION FOR LOAD UP TO 100kVA<br />

2.1 Purpose<br />

The application for the supply of electricity with load up to 100kVA which is for a 3 phase low voltage system<br />

is outlined here.<br />

2.2 What The Applicant Should Do<br />

The applicant should take the following steps to apply for supply of electricity up to 100kVA for a 3-phase<br />

low voltage system.<br />

Steps Action Reference<br />

1<br />

Appoint an Electrical Contractor who is registered with The Energy<br />

Commission, who will act on their behalf and submit the application for the<br />

applicant using the Supply Application Form available at Kedai <strong>Tenaga</strong>.<br />

The Electrical Contractor must be<br />

registered with the Energy Commission<br />

2 Settle connection charges billed by TNB through the Electrical Contractor<br />

Statement of Connection Charges<br />

booklet available at any Kedai <strong>Tenaga</strong><br />

3<br />

After completion of TNB’s work (before installation of meter), the<br />

applicant shall:<br />

• Deposit a sum of money equivalent to 2 months bill or as reviewed from<br />

time to time. For deposit of more than RM2,000, the applicant can settle<br />

either in cash or Bankers Guarantee<br />

• Sign electricity supply contract with TNB through the appointed<br />

Electrical Contractor<br />

Tariff booklet available at the nearest<br />

Kedai <strong>Tenaga</strong><br />

2.3 What The Electrical Contractor Should Do<br />

The Electrical Contractor appointed by the applicant should take the following action:<br />

Steps Action Reference<br />

1 Submit application for the applicant using the Supply Application Form<br />

available at Kedai <strong>Tenaga</strong>.<br />

All documents in checklist must be completed, duly endorsed by the<br />

appropriate competent person(s) of the appropriate category and attached<br />

with the application.<br />

Appendix 3<br />

2 After TNB has :<br />

• validated compliance to checklist<br />

• conducted analysis of supply connection<br />

• reviewed connection charges and issue bill to contractor<br />

Statement of Connection<br />

Charges Booklet available<br />

at any Kedai <strong>Tenaga</strong><br />

The applicant shall settle connection charges to TNB.<br />

3 After TNB has implemented work on site, the Electrical Contractor shall:<br />

• Submit G and H form certifying the internal installations<br />

have been tested<br />

• Arrange for applicant to sign supply contract with TNB<br />

• Arrange appointment for meter installation with TNB<br />

Tariff Booklet available at nearest<br />

Kedai <strong>Tenaga</strong><br />