Appendix 6<br />
ELECTRICITY SUPPLY APPLICATION EXCEEDING 100 kVA<br />
CONSULTANT ENGINEER CHECKLIST<br />
No. Form / Document Information Required<br />
1 Summary of Load Data<br />
(A) Basic Information<br />
Address of Installation<br />
Name & Address of Architect<br />
Name & Address of Surveyor<br />
Name & Address of Owner/Developer<br />
Name & Address of Consultant Engineer<br />
Name & Address of Electrical Contractor<br />
Type of Premise<br />
Voltage Level (HV or LV)<br />
Total Load required (kW)<br />
Date Supply Required<br />
Plans & Drawings<br />
i. Master Development/Layout Plan<br />
ii. Site Plan/Proposed Sub-station Sites<br />
iii. Layout Plan of Sub-station Building<br />
iv. Layout Plan of Main Switch-room<br />
v. Single Line Diagram/Schematic of Installation<br />
vi. Diskette for all the above plans<br />
(B) Load Details<br />
(C) Motor Loads<br />
(D) Harmonic Spectrum<br />
(E) Fluctuating Loads<br />
(F) Tolerence Limits<br />
(G) Capacitor Bank Installation<br />
(H) Load Profile & Consumption<br />
(I) Load Details for Mixed Development<br />
2 Substation Land Consent from land owner for leasing sub-station lot<br />
3. Metering Preliminary metering information sheet<br />