25.01.2015 Views

Tenaga Nasional Berhad

Tenaga Nasional Berhad

Tenaga Nasional Berhad

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 12<br />

Type of Fluctuating<br />

Load<br />

E. Details On Fluctuating Lo ads To Be Specified In Table Below:-<br />

Rate Of Changes For kW And<br />

kVAr per Minute<br />

kW/min kVAr/min<br />

Shortest repetitive time<br />

interval between kW & kVAr<br />

fluctuations in minutes<br />

The largest step changes<br />

in kW and kVAr<br />

F. Tolerence Limits For All Voltage Sensitive Equipment To Be Provided In The Table Below:-<br />

Voltage Sensitive Loads<br />

Steady-state tolerence limits<br />

as % of nominal voltage<br />

(maximum & minimum)<br />

Transient voltage tolerence<br />

limits of equipment as %<br />

of nominal voltage and<br />

corresponding duration<br />

% Time (ms)<br />

Harmonic voltage<br />

distortion tolerence limits<br />

as % of total harmonic<br />

and individual harmonic<br />

distortion<br />

Type of connection<br />

No. of bank<br />

kVAr/bank<br />

Total kVAr<br />

Type of control<br />

equipment<br />

G. Capacitor bank installation:-<br />

Star / Delta<br />

Monthly Peak MD (kW)<br />

H. Load profile and consumption data, if relevant:-<br />

Monthly Consumption<br />

Load Factor<br />

(hours/month)<br />

Estimated monthly consumption<br />

(kWh)<br />

Submitted by :<br />

(Signature of Electrical Consultant)<br />

I. Load details for mixed development:-*<br />

Date :<br />

* Kindly use the format as in APPENDIX 13<br />

86 TENAGA<br />

NASIONAL B E R H A D

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!