Appendix 9<br />
JOINT MEETING ACTION LOG (FOR SUPPLY APPLICATION > 100 kVA)<br />
To be filled in during joint Meeting<br />
DEVELOPER COMPANY : ___________________________<br />
CONSULTANT COMPANY : __________________________<br />
CONSULTANT ENGINEER CONTACT PERSON NAME : ________________<br />
CONSULTANT ENGINEER CONTACT NUMBER : ____________________<br />
MEETING<br />
DATE:<br />
MEETING<br />
DATE:<br />
PROJECT NO.<br />
PROJECT<br />
DESCRIPTION<br />
DATE APPLIED:<br />
ORIGINAL SUPPLY<br />
REQUEST DATE:<br />
REMARKS (OR TICK) RESPONSIBILITY (TICK ONLY) TARGET DATE<br />
Tech Item PK CONSULTANT PLAN OTHERS INITIAL REVISED<br />
1 Load Detail (Total Connected<br />
Load) (kVA)<br />
2. Load Applied MD<br />
(kW or A)<br />
3. Schematic<br />
Drawing (whole scheme)<br />
4. Location Plan<br />
5. Site Plan (Tapak)<br />
6. Key Plan<br />
7. HV & LV Cable Route<br />
& F/Pillar location<br />
8. Borang A for Substation<br />
9. Substation Design<br />
(if defers from TNB std)<br />
10. Trenches details<br />
(if defers from TNB std)<br />
11. Road Accessibility<br />
(8wks before work<br />
commence by TNB)<br />
12. Switch Room/MSB/<br />
Genset Location<br />
13. Tariff<br />
14. Metering Details<br />
CT sizes – Etc<br />
Tech Item:<br />
1. Customer Project Schedule<br />
2. Commitment Letter (if required)<br />
3. Deposit /Bank Guarantee<br />
(for P/E)<br />
Other Comment/issues Related To Project<br />
FILLED BY TNB PLANNER IN THE FINAL JOINT MEETING<br />
Date Planning Clock Starts<br />
Revised Supply Request<br />
Date (base on project timeline)<br />
………………………. ……………………… ……………………<br />
Pengurus Kawasan Consultant Planner Engineer<br />
TENAGA<br />
NASIONAL B E R H A D<br />