Tenaga Nasional Berhad
Tenaga Nasional Berhad
Tenaga Nasional Berhad
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4.0 GROUP METERING FOR WHOLE CURRENT METERING<br />
4.1 Location and height of meter position<br />
i. In multi-tenanted premises for e.g. high rise buildings, residential office/shopping complexes, flatted<br />
factories etc the meters shall be grouped at each floor of the tenants metering. There may be more than<br />
one group of metering location at each floor.<br />
ii.<br />
iii.<br />
iv.<br />
In open commercial outlets for e.g. hawker centres, there shall be centralized metering where the meter<br />
panel or box shall be rigidly and vertically mounted.<br />
The individual meter shall be properly and eligibly labelled with permanent metal plate to indicate<br />
clearly the meter supplying to the respective consumer.<br />
The height from the top of the meter panel shall not exceed 2.1m.<br />
4.2 Meter Panel<br />
i. The meter panel can be of mild steel or other TNB approved material and of thickness not less than 1.5<br />
mm.<br />
ii.<br />
iii.<br />
iv.<br />
Each meter panel shall accommodate a maximum of 5 meters only.<br />
The recommended size and arrangement of the meters, cutouts, and neutral link is as shown in Appendix<br />
27, Drawing No. 5A – 5C for single phase group metering and Appendix 28, Drawing No. 5D – 5F for<br />
three phase group metering.<br />
The holes for the termination wire to the meters shall have appropriate bushings to prevent the wires<br />
from being damaged.<br />
v. In the case of meter box with a cover, the metal plate on which the meters are mounted as well as the<br />
cover shall have minimum two metal hinges to enable it to be swung open for at least 90 o .<br />
vi.<br />
The wiring arrangement shall follow:<br />
• Single phase – Section 2 no. 2.5<br />
• Three phase – Section 3 no. 3.5<br />
TENAGA<br />
NASIONAL B E R H A D<br />
55