The establishment of transmission main intake also requires the allocation and acquisition of right of way or wayleaves<br />

for the transmission lines. Depending on the specific design of each PMU, the overall right of way or wayleaves<br />

requirements may be different.<br />

Developers of large-scale development areas, depending on the estimated demand may be required to allocate land for<br />

any or a combination of sub-stations categories, wayleaves or right of way for 132kV/275kV lines. These requirements<br />

will be specified by TNB upon submission of tentative layout plans and load estimates for the whole development<br />

area.<br />

4.2.3 Type of fire fighting System for the Substation<br />

Type of fire fighting system that is suitable for the substation has to meet the following criteria:<br />

• The fire extinguishing agent has to be the type that is approved by TNB.<br />

4.3 Standard And Special Feature Design Schemes<br />

Standard features of supply schemes are categorized as those typical design schemes for individual or consumer groups<br />

or classes. Typical cases are as follows:-<br />

(i)<br />

(ii)<br />

Supply scheme supplying domestic premises is predominantly through overhead systems and conventional substation.<br />

A fully underground network and any application of compact sub-station shall be considered as special<br />

features for which all extra costs incurred by TNB are to be paid in full by the consumer.<br />

Bulk consumers supplied at 11kV and above, are normally supplied via two in-feeds operating in parallel or nonparallel<br />

operation depending on the demand and security level required. If for any reason another dedicated cable<br />

is required purely for reasons of additional security, the extra costs shall have to be borne by the consumer.<br />

4.4 Supply Schemes For Interconnection To Embedded Generators<br />

Embedded generators depending on the capacity will be interconnected at 11kV and 33kV. The design of interconnection<br />

scheme or facilities, which may include protection, operational control facilities will be so determined to ensure safe,<br />

reliable and efficient interconnection scheme. The other design objective is to ensure that the interconnection of embedded<br />

generators should not negatively impact system performance and reliability to existing consumers connected to the TNB<br />

system.<br />