e)<br />

f)<br />

For voltage sensitive loads:<br />

(i) steady-state voltage tolerance limits of the equipment in percentage of the nominal voltage;<br />

(ii) intrinsic immunity limits to short duration voltage variation;<br />

(iii) transient voltage tolerance limits of the equipment in percentage of the nominal voltage and the<br />

corresponding duration;<br />

(iv) harmonic current emission limit for equipment.<br />

For Shunt Connected Reactors and Capacitors:<br />

(i) configuration and sizes of individual banks;<br />

(ii) types of switching and control equipment; and<br />

(iii) types of harmonic filtering reactors.<br />

Should a preliminary examination of the above data indicate that a more detailed information is required, the<br />

consumer shall provide the information upon request by TNB.<br />

TNB upon receipt of the data and information should perform assessments of the impacts of the loads on<br />

TNB’s distribution system. Consumers shall then be advised on TNB’s design of supply scheme and other<br />

technical requirements to be complied with by the consumers to ensure system performance is within the limits<br />

or standard.<br />

1.1.3 Supplies To Embedded / Distributed Generators<br />

1.1.3.1 Planning Data Requirements For Connection Of Embedded / Distributed Generators<br />

Embedded / distributed generator installations are treated as a different consumer class. For the purposes of planning<br />

the connection of a Distributed Generator to the Distribution System, TNB requires sufficient information to model the<br />

generating plant and carry out engineering studies for determining the method of connection to be employed, the voltage<br />

level of connection and its impacts on the Distribution System. The Distributed Generator shall provide the following<br />

information to TNB for planning purposes.<br />

(a) For all Generating Units<br />

(i) Terminal voltage;<br />

(ii) Rated kVA;<br />

(iii) Rated kW;<br />

(iv) Maximum Reactive Power sent out or minimum lagging power factor;<br />

(v) Maximum Reactive Power absorbed or minimum leading power factor;<br />

(vi) Type of Generating Unit – synchronous, asynchronous, etc.<br />

(vii) Type of prime mover;<br />

(viii) Type of voltage control;<br />

(ix) Generating Unit sub-transient reactance;<br />

(x) Generating Unit transformer details;<br />

(xi)<br />

Requirements for Top-Up Supply and/or Standby Supply.<br />