e)<br />
f)<br />
For voltage sensitive loads:<br />
(i) steady-state voltage tolerance limits of the equipment in percentage of the nominal voltage;<br />
(ii) intrinsic immunity limits to short duration voltage variation;<br />
(iii) transient voltage tolerance limits of the equipment in percentage of the nominal voltage and the<br />
corresponding duration;<br />
(iv) harmonic current emission limit for equipment.<br />
For Shunt Connected Reactors and Capacitors:<br />
(i) configuration and sizes of individual banks;<br />
(ii) types of switching and control equipment; and<br />
(iii) types of harmonic filtering reactors.<br />
Should a preliminary examination of the above data indicate that a more detailed information is required, the<br />
consumer shall provide the information upon request by TNB.<br />
TNB upon receipt of the data and information should perform assessments of the impacts of the loads on<br />
TNB’s distribution system. Consumers shall then be advised on TNB’s design of supply scheme and other<br />
technical requirements to be complied with by the consumers to ensure system performance is within the limits<br />
or standard.<br />
1.1.3 Supplies To Embedded / Distributed Generators<br />
1.1.3.1 Planning Data Requirements For Connection Of Embedded / Distributed Generators<br />
Embedded / distributed generator installations are treated as a different consumer class. For the purposes of planning<br />
the connection of a Distributed Generator to the Distribution System, TNB requires sufficient information to model the<br />
generating plant and carry out engineering studies for determining the method of connection to be employed, the voltage<br />
level of connection and its impacts on the Distribution System. The Distributed Generator shall provide the following<br />
information to TNB for planning purposes.<br />
(a) For all Generating Units<br />
(i) Terminal voltage;<br />
(ii) Rated kVA;<br />
(iii) Rated kW;<br />
(iv) Maximum Reactive Power sent out or minimum lagging power factor;<br />
(v) Maximum Reactive Power absorbed or minimum leading power factor;<br />
(vi) Type of Generating Unit – synchronous, asynchronous, etc.<br />
(vii) Type of prime mover;<br />
(viii) Type of voltage control;<br />
(ix) Generating Unit sub-transient reactance;<br />
(x) Generating Unit transformer details;<br />
(xi)<br />
Requirements for Top-Up Supply and/or Standby Supply.<br />
24 TENAGA<br />
NASIONAL B E R H A D