• Warning <strong>and</strong> escape: PA systems, beacons/lights, fire door <strong>and</strong><br />

damper release<br />

A separate package related <strong>to</strong> fire <strong>and</strong> <strong>gas</strong> is the diesel- or electrically-driven<br />

fire water pumps for the sprinkler <strong>and</strong> deluge ring systems.<br />

For fire detection, coincidence <strong>and</strong> logic are often used <strong>to</strong> identify false<br />

alarms. In such schemes, several detec<strong>to</strong>rs in the same area are required <strong>to</strong><br />

detect a fire condition or <strong>gas</strong> leakage for au<strong>to</strong>matic reaction. This will include<br />

different detection principles, e.g., a fire, but not welding or lightning strike.<br />

Action is controlled by a fire <strong>and</strong><br />

<strong>gas</strong> system (F&G). Like the ESD<br />

system, F&G action is specified<br />

in a cause <strong>and</strong> action chart<br />

called the Fire Area Protection<br />

Datasheet. This chart shows all<br />

detec<strong>to</strong>rs <strong>and</strong> fire protection<br />

systems in a fire area <strong>and</strong> how<br />

the system will operate.<br />

The F&G system often provides<br />

supervisory functions, either in<br />

the F&G or the information<br />

management system (IMS) <strong>to</strong><br />

h<strong>and</strong>le such tasks as<br />

maintenance, calibration or<br />

replacement <strong>and</strong> hot work<br />

permits, e.g., welding. Such<br />

actions may require that one or<br />

more fire <strong>and</strong> <strong>gas</strong> detec<strong>to</strong>rs or<br />

systems are overridden or<br />

bypassed. Specific work<br />

procedures should be enforced,<br />

such as a placing fire guards on duty, <strong>to</strong> make sure all devices are reenabled<br />

when the work permit expires or work is complete.<br />

8.1.4 Control <strong>and</strong> safety configuration<br />

Piping <strong>and</strong> instrumentation diagrams (P&ID) show the process. Additional<br />

information is needed for the specification of the process control <strong>and</strong> safety<br />

systems design <strong>and</strong> their control logic. These include: Loop diagram,<br />

Instrument datasheet, Cable schedule <strong>and</strong> Termination list.<br />