Oil and gas production handbook An introduction to oil ... - ABB Group
Oil and gas production handbook An introduction to oil ... - ABB Group
Oil and gas production handbook An introduction to oil ... - ABB Group
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The cycle starts with the plunger falling in<strong>to</strong> the well with its valve open.<br />
Condensed <strong>gas</strong> <strong>and</strong> <strong>oil</strong> can pass though the plunger until it reaches bot<strong>to</strong>m.<br />
There the valve is<br />
closed, now with a<br />
volume of <strong>oil</strong>,<br />
condensate or water<br />
on <strong>to</strong>p. Gas pressure<br />
starts <strong>to</strong> accumulate<br />
under the plunger <strong>and</strong><br />
after a time pushes<br />
the plunger upwards,<br />
with liquid on <strong>to</strong>p,<br />
which eventually flows<br />
out of the wellhead<br />
discharge.<br />
When the plunger<br />
reaches the wellhead<br />
plunger catcher, the<br />
valve opens <strong>and</strong><br />
allows <strong>gas</strong> <strong>to</strong> flow<br />
freely for some time<br />
while new liquid<br />
collects at the bot<strong>to</strong>m.<br />
After a preset time, the<br />
catcher releases the<br />
plunger <strong>and</strong> the cycle repeats.<br />
3.7 Well workover, intervention <strong>and</strong> stimulation<br />
After operating for some time, a well may become less productive or faulty<br />
due <strong>to</strong> residue buildup, s<strong>and</strong> erosion, corrosion or reservoir clogging.<br />
Well workover is the process of performing major maintenance on an <strong>oil</strong> or<br />
<strong>gas</strong> well. This might include replacement of the tubing, a cleanup or new<br />
completions, new perforations <strong>and</strong> various other maintenance works such as<br />
the installation of <strong>gas</strong> lift m<strong>and</strong>rels, new packing, etc.<br />
Through-tubing workover operation is work performed with special <strong>to</strong>ols that<br />
do not require the time-consuming full workover procedure involving<br />
replacement or removal of tubing. Well maintenance without killing the well<br />
<strong>and</strong> performing full workover is time-saving <strong>and</strong> often called well<br />
intervention. Various operations that are performed by lowering instruments<br />
or <strong>to</strong>ols on a wire in<strong>to</strong> the well are called wireline operations.<br />
38