Annual Report 2011-2012
Annual Report 2011-2012
Annual Report 2011-2012
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />
Project Results:<br />
• Classification of all commands given by ISO to electricity market participants,<br />
and investigation of the process of logging and reporting the events received by<br />
different participants (in four well-known electricity markets).<br />
• Investigation of all participants' requests and the procedures of responding them<br />
by ISO (in four well-known electricity markets).<br />
• Investigation of access degree to logged data in above-mentioned electricity<br />
markets.<br />
• A survey of the current procedures done by National Dispatching Center to log,<br />
record and report Iranian Power System operation events.<br />
• Preparation and development of a list of all reordable events.<br />
• Identification of the weakpoints and deficiencies in the current logging and<br />
reporting system operated in Iran Grid Management Company (IGMC) and<br />
expression of its finacial outcomes.<br />
• The study of technical and finacial outcomes of various events from IGMC and<br />
other participants' point of view.<br />
• Clarification of how Iranian National Dispatching Center (as a System Operator)<br />
and Iranian Electricity Market Operator access to recordable information.<br />
• Preparation and development of a comprehensive list of power system operation<br />
events and their impacts on participants' invoices.<br />
Project <strong>Report</strong>s:<br />
• Economics and Power Management Department; “The Study of Logging and<br />
<strong>Report</strong>ing Process of Power System Operation Events by ISO in Four Wellknown<br />
Electricity Markets” First Phase <strong>Report</strong>; Energy & Environment<br />
Research Center; Niroo Research Institute (NRI).<br />
• Economics and Power Management Department; “A survey of the current<br />
procedures done by National Dispatching Center to log, record and report<br />
Iranian Power System operation events” Second Phase <strong>Report</strong>; Energy &<br />
Environment Research Center; Niroo Research Institute (NRI).<br />
• Economics and Power Management Department; “Preparation of all<br />
Requirements and Exchange-Data System to Log, Record and <strong>Report</strong> of Power<br />
System Events and Data between Syetem Operator and Market Operator” Third<br />
Phase <strong>Report</strong>; Energy & Environment Research Center; Niroo Research Institute<br />
(NRI).<br />
91