<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

3. Participation in developing national and international standards:<br />

Laboratory personnel participated in the project "developing standards with Adaption<br />

Method" by employer" the Ministry of Energy Standards Office" providing expert<br />

opinions and participating in meetings of technical committees in 1390.<br />

Also in partnership with the National Committee for Electro technical Iran (INEC),<br />

technical committee of hybrid insulator in accordance with IEC (TC 36) in the NRI and<br />

the main activities in this field with study of documentation submitted by the IEC and<br />

provide technical opinions and growth was very good, so that the Islamic Republic of<br />

Iran was be permanent members of the committee and voting for the evaluation<br />

documented.<br />

4. Reference laboratories activities in the Assessment and Conformity<br />

Council and according to the production standards of Tavanir<br />

Reference laboratories Center, under contract with Tavanir, has run all necessary<br />

measures in accordance with the following clauses of the contract in 1390:<br />

• Number of council meetings held: 17<br />

• Numbers of regulations have been developed: 1<br />

The number of tests carried out in the Assessment Council as follow table:<br />

Item<br />

Year<br />

Equip Name<br />

84 85 86 87 88 89 90<br />

Total<br />

1 Composite suspension insulator 2 4 3 7 8 7 9 40<br />

2 Ceramic post line insulator 3 5 1 5 4 6 5 29<br />

3 Ceramic and Glass cap insulator 2 1 3 3 8 4 3 24<br />

4 Ceramic and Glass post insulator 3 4 5 15 1 2 3 33<br />

5 1 phase digital meter 1 12 1 3 9 7 13 46<br />

6 3 phase digital meter --- 12 4 13 7 5 5 46<br />

7 Transformer 3 --- 10 6 2 --- --- 21<br />

8 Cable 5 2 10 18 56 72 75 238<br />

9 Overhead conductor 2 3 2 25 74 76 37 219<br />

10 Electrical Hardware --- --- --- --- 36 55 73 164<br />

11 Cut out Fuse --- --- --- --- 1 2 5 8<br />

12 Switch Fuse,Fuse Switch,low voltage fuse 1 --- --- 1 24 4 3 33<br />

13 Miniature Circuit Breaker 1 4 --- 3 --- --- --- 8<br />

14 Transducers --- 2 1 --- --- --- --- 3<br />

15 RTU (Remote Terminal Unit) --- --- 1 --- --- --- 1 2<br />

16 CT (Current Transformer) 1 1 --- --- --- --- --- 2<br />

17 Radio modem --- 2 --- --- --- --- --- 2<br />

18 Relay 1 1 --- --- 1 --- --- 3<br />

19 Transmission Tower 4 10 17 17 14 10 11 88<br />

Total 25 53 41 99 231 240 243 1009<br />