<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Along with the manufacturing process, NRI has fulfilled all required quality control<br />

tests during the manufacturing stages such as those related to the materials used and noload<br />

electrical tests which might be listed as below:<br />

• Tests carried out on insulators, steel used in shafts and copper in windings.<br />

• Insulation tests including: pre-manufacturing over-voltage tests on stator coils<br />

and insulation resistance tests on both stator and rotor.<br />

• Supervising the stator/rotor cores manufacturing process and fulfilling the<br />

required tests on nominal magnetic flux in stator cores.<br />

• No-load, speed and temperature rise tests on windings and bearings.<br />

Pre-installation insulation resistance test on stator<br />

coils<br />

Nominal magnetic flux test<br />

Installation of stator winding coils<br />

Over-voltage test after installing the stator winding<br />

11