<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Title:<br />

Commissioning Distribution Concrete Poles & Lightning<br />

Poles Laboratory<br />

Department: Structure Department<br />

Project Manager: A.Darban<br />

Employer: NRI<br />

Project Code:--<br />

Project Staff: B.Bahramsary,A.Rahnavard,H.Ebrahimi,S.Ghanbari<br />

Project Summary:<br />

One of the most widely consumed goods and electrical power distribution network are<br />

the concrete poles. Different materials have been produced in this base world, and<br />

depending on the location, are selected. In building this base of different materials such<br />

as steel, aluminum, concrete, wood and composite materials are used. Concrete poles<br />

due to the ease and low cost consumables, used in many countries and distribution<br />

networks over 900 Fletcher workshops engaged in production of these grades.<br />

So it is important to Categories equipped with a reliable reference laboratory for quality<br />

control as standard products. Unfortunately, to date, despite the high volume production<br />

and distribution networks using a variety of concrete poles, procedural documentation<br />

and reference organ for the order process and product quality control is not existed.<br />

Most employers and clients such as regional elicricitycompanies, do not know how to<br />

control and testing and product. So most of the poles were purchased and installed<br />

without the necessary quality and after a little time those iems are repaired or replaced.<br />

Lighting poles are also among the national grid and items consumed in the manufacture<br />

of various materials such as steel, concrete and aluminum are used and unfortunately,<br />

despite forecasting a variety of tests and inspections in standards in our country there is<br />

no reference laboratory for testing these kinds of products. Now the design of the Lab is<br />

finished in a complete report & for next step the Lab will be started in NRI-OSTS.<br />