12.04.2015 Views

Annual Report 2011-2012

Annual Report 2011-2012

Annual Report 2011-2012

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Title:<br />

Investigation of modern dispatching control center in the<br />

world<br />

Department: Dispatching & Telemetry<br />

Employer: KHORASAN Regional Electric Company<br />

Project Manager: Amir Tavakoli<br />

Project Code: CDIBH01<br />

Project Staff: BaharehTorkaman, Leila Zafari, KhosroFarahani, MehranSoleymanifar,<br />

SoufiaAhanj, Kamran Ghavami, DolatJamshidi, SanazMahmoudi,<br />

FarhadGhaffarzadeh, Mehdi Kavousian<br />

Project Summary:<br />

The project was carried out in two phases. During the first phase, dispatching control<br />

centers in IRAN and other countries were studied from the view point of Centralized<br />

and Decentralized structures. Centralized control center means that the network grid<br />

network of a regional electric company monitored through a single control center.<br />

Decentralized control center means that the network grid control of a regional electric<br />

company monitored through a set of control centers. In the first phase the advantages<br />

and disadvantages of these patterns of monitoring and control was studied. In the<br />

second phase, IEC 61850 standard for using between control center and substations and<br />

IEC 61970 and IEC 61968 standard for data model of control centers were studied.<br />

Project Results:<br />

The artifacts of this project are reports about advantage and disadvantages of centralized<br />

and decentralized control centers in IRAN and some other countries. Another report<br />

contains advantages, disadvantages and limitations of using the latest standards and<br />

protocols in modern control centers. Investigation of IEC 60870-6-TASE.2 and a brief<br />

study about IEC 60870-5-101 and IEC 60870-5-104 are two separate sections that<br />

placed as appendixes in the reports.<br />

Project Documentation:<br />

• The report of investigation about Centralized and Decentralized control centers<br />

• The report of investigation about IEC 61850(to communicate between<br />

substations and control centers), IEC 61970 and IEC 61968 standards for using<br />

as a data model of control center software.<br />

• The report of investigation about IEC 60870-6-TASE.2 standard to<br />

communicate between control centers.<br />

• The report of a brief investigation about IEC 60870-6-TASE.2 standard to<br />

communicate between control centers.<br />

114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!