Project Title:<br />
Investigation of modern dispatching control center in the<br />
world<br />
Department: Dispatching & Telemetry<br />
Employer: KHORASAN Regional Electric Company<br />
Project Manager: Amir Tavakoli<br />
Project Code: CDIBH01<br />
Project Staff: BaharehTorkaman, Leila Zafari, KhosroFarahani, MehranSoleymanifar,<br />
SoufiaAhanj, Kamran Ghavami, DolatJamshidi, SanazMahmoudi,<br />
FarhadGhaffarzadeh, Mehdi Kavousian<br />
Project Summary:<br />
The project was carried out in two phases. During the first phase, dispatching control<br />
centers in IRAN and other countries were studied from the view point of Centralized<br />
and Decentralized structures. Centralized control center means that the network grid<br />
network of a regional electric company monitored through a single control center.<br />
Decentralized control center means that the network grid control of a regional electric<br />
company monitored through a set of control centers. In the first phase the advantages<br />
and disadvantages of these patterns of monitoring and control was studied. In the<br />
second phase, IEC 61850 standard for using between control center and substations and<br />
IEC 61970 and IEC 61968 standard for data model of control centers were studied.<br />
Project Results:<br />
The artifacts of this project are reports about advantage and disadvantages of centralized<br />
and decentralized control centers in IRAN and some other countries. Another report<br />
contains advantages, disadvantages and limitations of using the latest standards and<br />
protocols in modern control centers. Investigation of IEC 60870-6-TASE.2 and a brief<br />
study about IEC 60870-5-101 and IEC 60870-5-104 are two separate sections that<br />
placed as appendixes in the reports.<br />
Project Documentation:<br />
• The report of investigation about Centralized and Decentralized control centers<br />
• The report of investigation about IEC 61850(to communicate between<br />
substations and control centers), IEC 61970 and IEC 61968 standards for using<br />
as a data model of control center software.<br />
• The report of investigation about IEC 60870-6-TASE.2 standard to<br />
communicate between control centers.<br />
• The report of a brief investigation about IEC 60870-6-TASE.2 standard to<br />
communicate between control centers.<br />