<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />
Project Title:<br />
Basic Design and Preliminary Design Phases of the Project<br />
"Design and Fabrication of a 2MW Wind Turbine"<br />
Department: Wind Turbine R&D Dept.<br />
Employer: TAVANIR Co.<br />
Project Manager: Abbas Bahri<br />
Project Code: CWTVA01<br />
Project Summary:<br />
According to map of Ministry of Energy respect to wind energy development as one of<br />
the sources of energy and following preliminary studies and conceptual design of<br />
national wind turbine, a national project entitled "Design and Fabrication of a 2MW<br />
Wind Turbine", has been started in November 2010. The client of project is TAVANIR<br />
Co.<br />
In the first step, the project brake down, organizing the technical team, acquiring the<br />
team members, planning and budgeting the project in various phases has been carried<br />
out.<br />
In basic design phase, overall design of wind turbine system and general specs of main<br />
component has been determined. A bench mark study of commercial wind turbines has<br />
been used for this purpose. According to national wind atlas, the IEC class of wind<br />
turbine was determined and some sites for installing the prototype were nominated.<br />
With regard to basic design of wind turbine, a primitive 3D model of wind turbine has<br />
been created and MBS model of wind turbine was used for some dynamic analysis.<br />
In preliminary design phase, wind turbine was divided to some sub systems (regarding<br />
functionality and structural characteristics) and relevant sources were allocated to each<br />
part.<br />
Conducting iterative design method, the knowledge of components design has been<br />
developed by the team, as well as wind turbine system design. As an output of this<br />
phase, a preliminary mock up of wind turbine including 3D model of assembled major<br />
parts has been demonstrated. Purchasing specs of some component have been<br />
determined.<br />
In house standards of design, fabrication and test of different components, based on<br />
international standards, were proposed and approved.<br />
Suppliers and manufacturers of wind turbine components were identified for further<br />
communication.<br />
Domestic capabilities in prototype and mass production phases have been evaluated and<br />
plan of detail design phase has been revised.<br />
143