A team consisting of six CSTI experts came to Iran in May <strong>2012</strong>. Along with technical<br />

meetings in NRI, the team was present in Bandar Abbas power plants for four days.<br />

During their four days stay in this power plant, main components of the power plant<br />

were inspected by NRI, Bandar Abbas and CSTI technical teams.<br />

Based on this technical visit and technical meetings, a report about the condition of<br />

Bandar Abbas power plant and its possibility to be turned in to CHP was prepared.<br />