<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Title:<br />

Design and Fabrication of MEMS type Thermal conductivity<br />

Hydrogen sensor with its Online Analyzer<br />

Department: Electronics, Control and Instrumentation Projec tmanager: MortezaMozafari<br />

Employer: Esfahan Regional Electric Company, Niroo Research Institute ProjectCode: JCNBE0<br />

Project Staff: MortezaMozafari, Ali Melli, Mohammad Amin Kashiha, Yaldarajabzadeh,<br />

Pedramkeshavarzian, Somayehgholami, SaeedGolkhani, Hassan Koozegar<br />

Project Summary:<br />

After 2 years of efforts, the first Iranian system for measuring the purity of hydrogen of<br />

power plants generators was designed and built by electronics, control and<br />

instrumentation research department of NRI and with cooperation of the Esfehan<br />

regional electricity utility and shahidMontazeri power plant.<br />

So the technical knowledge of design and manufacturing of industrial MEMS sensors<br />

for measuring the purity of the gases was localized in the country.<br />

In this system, the measurement of hydrogen purity is done by an analyzer and a MEMS<br />

chip. MEMS technology is the integration of electronics and mechanical elements in<br />

micron scale, which is based on silicon wafers with high sensitivity. MEMS technology<br />

provides highly accurate measuring.<br />

Hydrogen purity measurement systems are critical equipments in the power plants witch<br />

are utilized for high-capacity generators and in their cooling systems.<br />

Now, to meet the needs of power plants, generally Russian, American and English<br />

systems are used. It should be noted that our system was installed in parallel with a<br />

foreign system at ShahidMontazeri power plant more than 4 months, and after running<br />

various tests, accuracy and performance of the system was approved.<br />

According to the economic estimates, we predict about 300 thousand dollars annual<br />

saving in foreign import in electricity industry of the country.<br />