<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Title:<br />

Supervising the manufacturing of three phase slip-ring<br />

6.6kW, 1400kW, 2040kW and 2200kW induction motors<br />

Department: Electrical machines<br />

Employer: Yazd water Company<br />

Project manager: M.Arghavan<br />

Project code:CEMAY01<br />

Project staff: S. Amini, A.R. GhaemPanah, A.P. khansarian, R. Sarafraz, I. Sadeghi<br />

Project Summary:<br />

Zayandehrud-Yazd water transmission line includes 4 pumping substations, each having<br />

4 Siemens-manufactured induction motors. The due major operator is Yazd Regional<br />

Water Co. To achieve an increment in water transmission capacity and better reliability<br />

in critical situations, the company ordered Turbogenerator Co. to manufacture four<br />

6.6kW, 1400kW, 2*2040kW and 2200kW induction motors. As a result, Niroo<br />

Research Institute was chosen to take part as the technical supervisor in the project.<br />

2200kW induction motor by Turbogererator<br />

Pumping substation<br />