12.04.2015 Views

Annual Report 2011-2012

Annual Report 2011-2012

Annual Report 2011-2012

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Results:<br />

Results of technical/economical evaluation for the selected units are:<br />

• Determination the influence of the flue gas removal on the air heater<br />

performance.<br />

• Determination the parameters that affect power plant and CO2 capture<br />

operation.<br />

• Determination the energy and material consumption of CO2 capture unit.<br />

• Design review of drawing and documents of CO2 capture unit and checking the<br />

constructor design to conform with the accomplished design.<br />

• Calculation of the cost of CO2 capture per ton from Bessat power plant.<br />

Project Documentations:<br />

• Power Plant Operation Studies Department, “Technical Investigation of CO2<br />

Capture from Besaat Power Plant Flue Gas”, Power Generation Research<br />

Center, NRI.<br />

42

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!