12.04.2015 Views

Annual Report 2011-2012

Annual Report 2011-2012

Annual Report 2011-2012

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Results:<br />

• Documentation of the information concerning the installation considerations of<br />

the partial discharge equipments in mines with difficult conditions.<br />

• Documentation of the experiences in challenging with installation of partial<br />

discharge equipments in mines.<br />

Project Documentation:<br />

• Information and technical specifications of 47 electromotors in Mes Sarcheshme<br />

complex.<br />

• Photos taken from the terminal box of 47 electric motors and generators<br />

• The investigation report of partial discharge in switchgears.<br />

• Installation report of partial discharge measuring equipments in Mes<br />

Sarcheshmeh complex.<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!