<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Title:<br />

Technical advice and installation of partial discharge<br />

measuring Equipment in Neka power plant<br />

Department: Electrical machines<br />

Employer: Neka electrical power Generation Company<br />

Project staff: S. Amini Valashani, R. Sarafraz, S. Gouran, M.Arghavan<br />

Project Summary:<br />

Project manager :A. Farshidnia<br />

Project code: PEMNN02<br />

It is clear that implementation of maintenance systems that are based on monitoring<br />

devices, reduces the costs of maintenance and increase the reliability and system<br />

efficiency. On line monitoring of partial discharge in rotating electric machines is<br />

helpful to diagnosis of insulation without shutting down the systems. Industrial units are<br />

70% depends on the rotating electric machines so this point is so important. Neka power<br />

plant with four 440 MW steam units for each unit is one of the most important and large<br />

power plants in the country. According to passing the 25 years of the operation of this<br />

power plant the necessity of estimating the quality of the insulation of generators and<br />

motors of Neka power plant was inevitable. So by installing the capacitive couplers on<br />

generator on steam unit number one on 1379 and other three generator units and 9<br />

motor devices on 1382 partial discharge monitoring system was installed on power<br />

plant.<br />

By confirmation of these measuring systems this contract was generalized to 28 high<br />

voltage motor devices also 2 generator units. Also continues partial discharge<br />

measuring device was installed on 4 steam generators and their data transferred to the<br />

control rooM.Data analyzing in more than 3 years leads to gathering a good data bank<br />

that this research group could have ability to analyzing the partial discharge data or<br />

recognize the fault operation of insulation of units. By this performance one version of<br />

data bank software in (Net) was prepared in electric machine research group and<br />

delivered to the employer.<br />

4