12.04.2015 Views

Annual Report 2011-2012

Annual Report 2011-2012

Annual Report 2011-2012

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Results:<br />

• Determination of selection criteria of proper site for establishment a wind<br />

turbine test center in Iran<br />

• Selection of two pieces of land from National Lands of Aliabad and Vazdeh<br />

towns, Abhar belongings in Zanhan Province for establishment a wind turbine<br />

test center<br />

Project Documentation:<br />

• Renewable Energy Dept.; “Determination of selection criteria of proper site for<br />

establishment a wind turbine test center in Iran”; Energy and Environment<br />

Research Center; NRI; June <strong>2011</strong>.<br />

• Renewable Energy Dept.; “Field visit of regions Kahak, Jarandaq and Nikuye”;<br />

Energy and Environment Research Center; NRI; Aug <strong>2011</strong>.<br />

• Renewable Energy Dept.; “Selection of site for establishment a wind turbine test<br />

center”; Energy and Environment Research Center; NRI; Sep <strong>2011</strong>.<br />

• Renewable Energy Dept.; “Determination of erection position of a MW wind<br />

turbine unit in selected sites”; Energy and Environment Research Center; NRI;<br />

Sep <strong>2011</strong>.<br />

93

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!