<strong>Annual</strong> Research <strong>Report</strong><br />

<strong>2011</strong>-<strong>2012</strong><br />

Project Title:<br />

Investigation of main and auxiliary systems performance<br />

on<br />

gas<br />

turbine<br />

efficiency in Abadan power plant<br />

Department: Power plant operation systems Dept. Project Manager: M.RahimiTakami<br />

Employer: Khouzestan Regional Electric Company Project Code: COPBO04<br />

Project Staff:: M.Saeedipour,<br />

M.Taheri, S. Shahmansouri, N. Irani, E. Gharibian, M.E.<br />

SarbandiFarahani, A.Sadeghabadi<br />

Project Summary:<br />

Iranian power generation industry sector has experienced a rapid expansion during last<br />

decades. Gas turbine and combined cycle units have the most important role in<br />

development of<br />

power generation sector.<br />

In this regard, the present project was<br />

defined and implemented in order to determine<br />

potential improvements and provide solutions for<br />

increasing<br />

capacity and efficiency of<br />

gas turbines of Abadan power plant. For this purpose, the auxiliary systems of the plants<br />

weree investigated. Internal energy consumption and contribution of the<br />

consumers and<br />

influence of these systems performance on gas turbine efficiency are the<br />

most important<br />

topics which have been studied. Furthermore, practical solutions for improvement of<br />

auxiliary systems have been determined. For evaluation of main systems performance,<br />

the measuring instruments<br />

were calibrated and a performance test was<br />

performed. The<br />

obtained results were compared with acceptance test results. The generated and gathered<br />

data and information, weree used for troubleshooting and investigation<br />

the power plant<br />

efficiency reduction reasons. According to obtained results, the<br />

strategiess for<br />

performance improvement<br />

of the mentioned unit were determined.<br />