<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Results:<br />

Results of technical/economical evaluation for the selected units are:<br />

• Nominating the Chabahar gas power plant as the most appropriate plant to<br />

undergo the CCHP project.<br />

• Evaluating the various configurations for the CCHP plan and selecting the most<br />

appropriate plan for Chabahar plant<br />

• Defining the capacity and efficiency increase potential in the gas and combined<br />

cycle plants located in south of Iran in case of converting into CCHP cycle.<br />

• Introducing a road map for execution of the similar CCHP plans on appropriate<br />

plants all over the country<br />

Project Documentation:<br />

• Power Plant Operation Studies Dept, "Conceptual Design of a CCHP system for<br />

a selected power plant", Power Generation Research Center, NRI.<br />

• Power Plant Operation Studies Dept, "Evaluating the Implementation costs and<br />

economical benefits of employing the CCHP plan in Chabahar power plant and<br />

its effects on average efficiency of the power plants running by Tavanir", Power<br />

Generation Research Center, NRI.<br />