12.04.2015 Views

Annual Report 2011-2012

Annual Report 2011-2012

Annual Report 2011-2012

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Results:<br />

• Identification of performance principles and standards for geothermal power<br />

plants in the world<br />

• Preparation a list of devices, equipment and components for geothermal power<br />

plants<br />

• Identification the local and foreign companies related to manufacturing and<br />

installation of systems and equipment.<br />

• Investigation of effective factors related to failure of geothermal plants<br />

• development the software for design of power plant equipments<br />

• Provision a database software for geothermal power plants equipment<br />

• Determination of equipment's general characterization and Provision of (P & ID)<br />

drawings with an estimated average cost of 20 MW instantaneous evaporation<br />

geothermal power plant at Meshkinshahr region<br />

Project Documents:<br />

• Renewable Energies Department, report of "Recognition of principles and<br />

standards for geothermal power plants," Energy and Environment Research<br />

Center, NRI.<br />

• Renewable Energies Department, report of " Inventory of systems, equipment<br />

and components for geothermal power plants," Energy and Environment<br />

Research Center, NRI<br />

• Renewable Energies Department, report of "Recognition of domestic and<br />

foreign companies as equipment manufacturer and installer of geothermal power<br />

plants" Energy and Environment Research Center, NRI<br />

• Renewable Energies Department, report of "Failure factors of equipments in<br />

geothermal power plants and preparation of power plant software" Energy and<br />

Environment Research Center, NRI.<br />

• Renewable Energies Department, report of " Determination of equipment's<br />

general characterization and Provision of (P & ID) drawings with an estimated<br />

average cost of 20 MW instantaneous evaporation geothermal power plant at<br />

Meshkinshahr region" Energy and Environment Research Center, NRI.<br />

104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!