<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Carrying out the first phase of the project "site survey &<br />

feasibility study for repowering of unit one of Bandar Abbas<br />

power plant" (CSTI/Techint)<br />

Since, around 7000 MW of power plants need to be repowered or replaced, TAVANIR,<br />

as responsible for supplying electricity for the country is facing the problem of aging of<br />

power plants.<br />

In this regard NRI has been appointed by TAVANIR Company for "compilation of<br />

repowering strategy for old steam power plants of Iran". Based on the results of the<br />

above mentioned project, Bandar Abbas Power plant was nominated for implementation<br />

of repowering.<br />

This is for the first time in Iran that a power plant is being repowered so successful<br />

implementation of that can lead to 15% increase in efficiency of power plants.<br />

In this regard two Italian companies, CSTI and Techint, which have experience in<br />

repowering of two similar power plants in Italy, were choseN.It's worth mentioning that<br />

engineers and officials of CSTI had contribution in commissioning of Bandar Abbas<br />

power plant.<br />

After some rounds of negotiations and paying a visit to repowered power plants in Italy<br />

by NRI and TAVANIR representative, contract for "site survey & feasibility study for<br />

repowering of unite one of Bandar Abbas power plant" was signed between NRI and<br />

CSTI/Techint.<br />