12.04.2015 Views

Annual Report 2011-2012

Annual Report 2011-2012

Annual Report 2011-2012

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Annual</strong> Research <strong>Report</strong> <strong>2011</strong>-<strong>2012</strong><br />

Project Title:<br />

Analysis of Failures of 159MW Gas Turbine hub<br />

Department: Metallurgy<br />

Project Manager: M.R. Shirpay<br />

Employer: NRI<br />

Project Code: CMTMP02<br />

Project Staff: A.A. Fallah, M.Ardestani<br />

Project results:<br />

Premature and unexpected failure of hot gas path components in gas turbine can affect<br />

their performance. Such failures result in significant expenditures for the actual repairs<br />

as well as for the purchase of replacement power during the repair outages. The main<br />

failure mechanisms of these components are creep, fatigue, corrosion and erosion. Study<br />

of failure mechanism and causes is necessary to prevent failure repetition in the future.<br />

In this project, the hub failure in a 159 MW gas turbine was investigated and their<br />

operating records were studied.<br />

Finally the hub failure root cause was determined and proper corrective actions were<br />

recommended to prevent failure repetition in the future.<br />

Project Results:<br />

• Determining the main causes of premature failure of 159 MW gas turbine hub<br />

• Recommending preventive methods for failures of 159 MW gas turbine hub<br />

Project Documentation:<br />

• “Analysis of Failures of 159MW Gas Turbine Hub”, Metallurgy Department;<br />

Chemistry and Materials Research Center, NRI, <strong>2011</strong>.<br />

134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!