10.07.2015 Views

Health & Life Safety Manual - Electronic Resource Center

Health & Life Safety Manual - Electronic Resource Center

Health & Life Safety Manual - Electronic Resource Center

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CERTIFICATE OF APPROVAL FOR THE EXPENDITURE OFFIRE PREVENTION AND SAFETY FUNDS(Section 17-2.11 of the School Code)This certificate supersedes the Original Survey or Certificate of Approval dated 11/0/2001 in the amount of $1,234,567.89 computed in consideration ofAmendment No. 8 dated 1/13/2004Previously Approved $1,234,567.89This Amendment $1,100,000.00Total Approved to Date $2,334,567.89I, Robert E. Schiller, State Superintendent of Education, acknowledge receipt of the estimate of cost certified by the architect/engineer required:1. c to bring this school building into compliance with the safety standards set forth in 23 Ill. Adm. Code Part 175, 23 Ill. Adm.Code Part 180, and or 23 Ill. Adm. Code Part 185 as promulgated by the State Board of Education.2. c to bring the school building into compliance with the Asbestos Abatement Act 105 et seq of the School Code and theAsbestos Hazard Emergency Response Act (AHERA).3. c to provide funds for accessibility pursuant to Section 17-2.11 of the School Code and 71 Ill Adm. Code Part 400 with fundsnot necessary for the completion of items under No. 1 above.4. c to provide for necessary school security systems and equipment with funds not necessary for the completion of approveditems under No. 1 above5. c to provide funding for energy conservation pursuant to Section 17-2.11 of the School Code with funds not necessary for thecompletion of approved items under No. 1 above.6. c to provide funding for repair of schools sidewalks, playgrounds, parking lots, or school bus turnarounds pursuant to Section17-2.11 of the School Code with funds not necessary for the completion of approved items under No. 1DISAPPROVED ITEMS:ITEM DESCRIPTION AMOUNT REASON1&2 Arch/Engr. Fees/contingencies,other fees$1,250.00 In excess of allowable fees funded through H/LS.I Further certify that the estimate of total approval to date, in the amount of $ 82,496.00 has been examined and determined to be reasonable and ishereby approved.Robert H ArchitectArchitect / EngineerBest Architectural Group Inc.Firm Certifying Estimate of CostA-Z CENTRAL HIGH SCHOOLSchool BuildingLincolnCountyA-Z CENTRAL CUSD 123District Name and NumberJanuary 24, 2004State SuperintendentSignature of State Superintendent of EducationORIGINAL School District COPY Regional Superintendent County Clerk ArchitectForm 35-22 (3/04) (Prescribed by ISBE for IBSE use) 180.500 g)4-22

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!