10.07.2015 Views

Shaping the Energy Efficiency in New Buildings - Building Energy ...

Shaping the Energy Efficiency in New Buildings - Building Energy ...

Shaping the Energy Efficiency in New Buildings - Building Energy ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

AUSBCA 2007,cont<strong>in</strong>uedCAN 69MNECB1997SoftwareMethodologyDescribed <strong>in</strong>CodesYes (referred toano<strong>the</strong>rdocument) 70Exist<strong>in</strong>gSoftwareEE4,EE4 Code 71 ,BILTRADfree of chargeAccessibilitySoftware provided byCanmetENERGY with<strong>in</strong>Natural Resources Canada;accessible on <strong>the</strong> <strong>in</strong>ternetfree of chargeDescriptionE20-II, eQUEST, VisualDOE, <strong>Energy</strong>Plus For Class 3, 5, 6, 7, 8 and 9 build<strong>in</strong>gs (mostly nonresidential) Meets <strong>the</strong> Australian Build<strong>in</strong>g Codes Board’s Protocolfor Build<strong>in</strong>g <strong>Energy</strong> Analysis Software Version 2006.1 eQUEST, VisualDOE and <strong>Energy</strong>Plus are mostlysimulation programsEE4 Applies all of Natural Resources Canada’s validationof new build<strong>in</strong>g design rules to confirm that a design isat least 25% more energy efficient than if everyelement of <strong>the</strong> build<strong>in</strong>g envelope, light<strong>in</strong>g, HVAC andservice water systems were constructed to meetMNECB 1997 requirements. Uses a performance path approachEE4 Code Aligns strictly with MNECB 72 Compares proposed build<strong>in</strong>g design with build<strong>in</strong>g ofsimilar reference design built strictly to MNECB level Reports differences <strong>in</strong> energy performance for HVAC,envelope, light<strong>in</strong>g and service hot water Uses a performance path approach69 For more <strong>in</strong>formation, please see http://canmetenergy-canmetenergie.nrcan-rncan.gc.ca/eng/software_tools.html.70 “Trade-off Compliance for Build<strong>in</strong>gs: Specifications for Calculation Procedures for Demonstrat<strong>in</strong>g Compliance to <strong>the</strong> MNECB” published by CanadianCommission on Build<strong>in</strong>g and Fire Codes.71 EE4 and EE4 Code are be<strong>in</strong>g replaced with software based on eQuest.72 In contrast to EE4 Code, EE4 credits some efficiency measures (e.g., controls) that were not <strong>in</strong>cluded <strong>in</strong> <strong>the</strong> code.83

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!