12.07.2015 Views

american samoa - University of Hawaii at Manoa Botany Department

american samoa - University of Hawaii at Manoa Botany Department

american samoa - University of Hawaii at Manoa Botany Department

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

flow velocities have apparently gener<strong>at</strong>ed excessive erosion along the east bank <strong>of</strong> Papa Streamand littered the stream bed with considerable amounts <strong>of</strong> rock and debris.Due to the erosive n<strong>at</strong>ure <strong>of</strong> soils along the stream bank, aggressive bank stabiliz<strong>at</strong>ion practicesshould be used to help improve stream hydrology and reduce the amount <strong>of</strong> future stream bankerosion. While various construction options are available, it recommended th<strong>at</strong> the east bank <strong>of</strong>Papa Stream be armored with basaltic rock and grouted with a concrete slurry along theupstream and downstream sides <strong>of</strong> the Tauese Stream discharge (Figure 7-3). This approachwill enable the construction <strong>of</strong> a strong bank structure without increasing the velocity <strong>of</strong>downstream stream flows.Option 3: Restore Stream P<strong>at</strong>h Upstream <strong>of</strong> Project AreaOption 3 would design and construct stream improvements th<strong>at</strong> would:• restore the former single, stream p<strong>at</strong>h some 700 to 800 feet upstream <strong>of</strong> st<strong>at</strong>ion 11+80;• somewh<strong>at</strong> reduce stream velocities downstream <strong>of</strong> the basaltic wall th<strong>at</strong> has gener<strong>at</strong>edsignificant downstream bank erosion;• reduce further downstream bank erosion along east and west banks <strong>of</strong> Papa Stream; and,• provide potential opportunities for planting wetland trees such as ifi along the 100-150-footlength <strong>of</strong> the stream bank th<strong>at</strong> has been impacted by stream modific<strong>at</strong>ion.ASEPA/ASDOC would need to retain a pr<strong>of</strong>essional engineer to design conceptual,preliminary, and final construction drawings, as well as preliminary cost estim<strong>at</strong>es, for thisstream improvement project. Once funds are secured for this project, a building contractorwould be selected for construction <strong>of</strong> the proposed design.Compar<strong>at</strong>ive Benefits and ImpactsPPC’s evalu<strong>at</strong>ion <strong>of</strong> the three altern<strong>at</strong>e restor<strong>at</strong>ion and enhancement str<strong>at</strong>egies is summarized inTable 7-6. Option 1 provides somewh<strong>at</strong> gre<strong>at</strong>er benefits to wetland veget<strong>at</strong>ion and fish andinvertebr<strong>at</strong>e habit<strong>at</strong> for a reasonable cost. Option 2 provides some needed improvementsbetween st<strong>at</strong>ion 5+00 and 6+00 th<strong>at</strong> would help reduce bank erosion and potential floodingalong a portion <strong>of</strong> lower Papa Stream.Option 3 would address a significant bank erosion and stream hydrology upstream <strong>of</strong> theproject area. This project would provide some benefits to wetland veget<strong>at</strong>ion, as well as fishand invertebr<strong>at</strong>e habit<strong>at</strong>. However, the potential significant cost associ<strong>at</strong>ed with this projectmakes this project less desirable despite its need.TABLE 7-6COMPARATIVE EVALUATIONWETLAND RESTORATION AND ENHANCEMENT OPPORTUNITIESLOWER PAPA STREAMOption Project Residential Subsistence Fish & Wetland/ StreamCost Land Uses Agriculture Invertebr<strong>at</strong>e Riparian BankFlood Hazards& PropertyDamageHabit<strong>at</strong> Veget<strong>at</strong>ion Stability1 LC LB NBC MB SB NBC LB2 MC NBC NBC MB LB NBC MB3 SC MB NBC LB LB NBC LBNotes: Potential project benefits were r<strong>at</strong>ed by PPC as follows:SB Significant project benefitsLC Limited undesirable consequencesMB Moder<strong>at</strong>e project benefitsMC Moder<strong>at</strong>e undesirable consequencesLB Limited project benefitsSC Significant undesirable project impactsNBC No anticip<strong>at</strong>ed project benefits orundesirable consequencesSource: Pedersen Planning Consultants, 2000American Samoa Wetland/Stream Restor<strong>at</strong>ion and Enhancement PlanFebruary 2001, Papa Stream, Page 7-11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!