12.07.2015 Views

american samoa - University of Hawaii at Manoa Botany Department

american samoa - University of Hawaii at Manoa Botany Department

american samoa - University of Hawaii at Manoa Botany Department

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

TABLE 5-4COMPARATIVE EVALUATIONWETLAND RESTORATION AND ENHANCEMENT OPPORTUNITIESVATIA WETLANDOptionProjectCostResidentialLand UsesSubsistenceAgricultureFish &Invertebr<strong>at</strong>eHabit<strong>at</strong>Wetland/RiparianVeget<strong>at</strong>ionStreamBankStabilityFlood Hazards& PropertyDamage1 LC MB NBC LB SB MB NBC2 LC NBC NBC LB SB MB NBCNotes: Potential project benefits were r<strong>at</strong>ed by PPC as follows:SB Significant project benefitsLC Limited undesirable consequencesMB Moder<strong>at</strong>e project benefitsMC Moder<strong>at</strong>e undesirable consequencesLB Limited project benefitsSC Significant undesirable project impactsNBC No anticip<strong>at</strong>ed project benefits orundesirable consequencesSource: Pedersen Planning Consultants, 2000Recommended Option and Estim<strong>at</strong>ed Project CostThe restor<strong>at</strong>ion <strong>of</strong> the mangrove forest immedi<strong>at</strong>ely upstream <strong>of</strong> the Fa<strong>at</strong>afe Stream mouth(Option 1) is recommended for implement<strong>at</strong>ion. This wetland restor<strong>at</strong>ion project isrecommended because the project can provide significant improvements to wetland veget<strong>at</strong>ion,enhance the adjoining residential area, and provide a source <strong>of</strong> food to humans and flyingfoxes.The costs associ<strong>at</strong>ed with the restor<strong>at</strong>ion <strong>of</strong> the mangrove forest would primary be associ<strong>at</strong>edwith the initial clearing <strong>of</strong> the Fa<strong>at</strong>afe Stream mouth, culvert underne<strong>at</strong>h the shoreline roadway,as well as the collection <strong>of</strong> some trash and solid waste m<strong>at</strong>erial 450 feet upstream. Thesubsequent collection and planting <strong>of</strong> mangrove, fau, and milo tree cuttings would be carriedout by the ASCC Land Grant Program.These estim<strong>at</strong>ed cost associ<strong>at</strong>ed with the initial clearing <strong>of</strong> the Fa<strong>at</strong>afe Stream mouth, roadwayculvert and upstream area would be approxim<strong>at</strong>ely $2,996 (Table 5-5). The propag<strong>at</strong>ion <strong>of</strong> treeseedlings, the collection <strong>of</strong> tree cuttings, as well as the planting <strong>of</strong> recommended veget<strong>at</strong>ionwould cost an estim<strong>at</strong>ed $2,811 (Table 5-6). Consequently, overall project expenditures wouldcost an estim<strong>at</strong>ed $5,807.TABLE 5-5PRELIMINARY COST ESTIMATECLEARING OF FAATAFE STREAM MOUTH, CULVERT, AND UPSTREAM AREALABORPersonnel Number Hours Hourly R<strong>at</strong>e ($) Cost ($)SupervisorHeavy Equip. Oper<strong>at</strong>or1140401513600520Laborer 2 40 6 480All Personnel 4 160 $1,600MATERIALSItem Quantity Unit Cost ($) Cost ($)PicksSledge Hammers3115254525Shovel 3 22 66Weed-e<strong>at</strong>ers 3 300 900MachetesGarbage Bags320 boxes20560100Wheel BarrowsAll M<strong>at</strong>erials3 50 150$1,346TOTAL LABOR AND MATERIALS $2,946American Samoa Wetland/Stream Restor<strong>at</strong>ion and Enhancement PlanFebruary 2001, V<strong>at</strong>ia Wetland, Page 5-12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!