12.07.2015 Views

american samoa - University of Hawaii at Manoa Botany Department

american samoa - University of Hawaii at Manoa Botany Department

american samoa - University of Hawaii at Manoa Botany Department

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Recommended Option and Estim<strong>at</strong>ed Project CostShould reasonable village support exist for Option 1, this project is recommended for projectimplement<strong>at</strong>ion. While costly, this wetland enhancement project is <strong>at</strong>tractive because theproject could likely achieve restor<strong>at</strong>ion <strong>of</strong> a disturbed marsh to a coastal marsh. Removal andhauling <strong>of</strong> solid wastes, as well as the planting <strong>of</strong> coastal marsh plants is estim<strong>at</strong>ed to costroughly $10,224 (Table 11-3 and Table 11-4).TABLE 11-3PRELIMINARY COST ESTIMATECOLLECTION, REMOVAL AND HAULING OF SOLID WASTE MATERIALFUSI WETLANDLABORPersonnel Number Hours Hourly R<strong>at</strong>e ($) Cost ($)Supervisor 1 80 15 1,200Heavy Equipment Oper<strong>at</strong>or 3 60 13 2,340Laborer 4 80 6 1,920All Personnel 8 580 $5,460MATERIALSItem Quantity Unit Cost ($) Cost ($)Picks 4 15 60Sledge Hammers 4 25 100Shovel 4 22 88Weed-e<strong>at</strong>ers 4 300 1,200Machetes 4 20 80Garbage Bags 50 boxes 5 250Wheel Barrows 4 50 200All M<strong>at</strong>erials $1,978TOTAL LABOR AND MATERIALS $7,438Notes: Preliminary estim<strong>at</strong>e assumes use <strong>of</strong> existing equipment owned by the ASG <strong>Department</strong> <strong>of</strong> Public Works.Source: Pedersen Planning Consultants, 2000TABLE 11-4PRELIMINARY COST ESTIMATEPROPAGATION AND PLANTING OF COASTAL MARSH VEGETATIONFUSI WETLANDLABORPersonnel Number Hours Hourly R<strong>at</strong>e ($) Cost ($)ASCC Plant Nursery Technician 1 104 10 1,040ASCC Field Crew Leader 1 20 8 160ASCC Field Crew Members 2 20 6 240All Personnel 4 164 $1,440MATERIALSItem Quantity Unit Cost ($) Cost ($)Coastal Marsh Plants 125 3 375Garbage Bags 20 boxes 5 100All M<strong>at</strong>erials $475EQUIPMENTShovels 3 22 66Machetes 3 20 60Picks 3 15 45Wheel Barrows 2 50 100Weed-e<strong>at</strong>ers 2 300 600All Equipment $871TOTAL LABOR AND MATERIALS $2,786Notes: Preliminary estim<strong>at</strong>e assumes use <strong>of</strong> existing equipment owned by the ASG <strong>Department</strong> <strong>of</strong> Public Works.Source: Pedersen Planning Consultants, 2000American Samoa Wetlands/Streams Restor<strong>at</strong>ion and Enhancement PlanFebruary 2001, Fusi Wetland, Page 11-10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!