presents requirements <strong>for</strong> support ofLFSP operations to the CATF. Theserequirements will be presented as earlyas possible in the planning phase.• The CATF is responsible <strong>for</strong>preparation of related plans thatprovide facilities and means to ensureeffective support of LFSP operations.Examples of such plans are the pontooncauseway and lighterage plan, unloadingplan, casualty evacuation plan, and EPWevacuation plan. Integrated training ofshore party and beach party elements willbe conducted be<strong>for</strong>e embarkation begins.9. Pontoon Causeway andLighterage Plansa. The CLF is responsible <strong>for</strong> presentingto the CATF requirements on which plans <strong>for</strong>pontoon causeways and lighterage support <strong>for</strong>the operation are based. The CATF preparesthe pontoon causeway and lighterage plan inconsultation with the CLF considering thefollowing:• LF requirements;• Hydrographic conditions; and• Availability of required types of sealift.b. The plan should include details onloading, transportation, launching, initialoperational assignment, and provisions <strong>for</strong>maintenance and salvage of the causeway andlighterage equipment. It also contains specificinstructions <strong>for</strong> transition of control. The planwill include provisions <strong>for</strong> retaining lighteragein the area after the assault shipping departs,<strong>for</strong> use in unloading follow-up shipping, and<strong>for</strong> other support of tactical operations. Theplan is published as an annex to the CATF’slogistic plan.10. Engineer PlansLogistics PlanningEngineer operations support thedevelopment of the battlespace <strong>for</strong> maneuver,enhance strategic and operational movement,and provide infrastructure <strong>for</strong> <strong>for</strong>ce protection.In addition to normal engineer operations (i.e.,combat, general, and topographic), specialconsiderations must be made <strong>for</strong> minecountermeasures and amphibious breaching,joint reception, staging, onward movement,and integration, offshore petroleum dischargesystems (OPDSs), and amphibious assaultbulk fuel and water systems connectivity.Involvement of the engineer staff is essentialin the planning and execution of all phases ofamphibious operations.Further guidance can be found in JP 3-34,Engineer <strong>Doctrine</strong> <strong>for</strong> <strong>Joint</strong> <strong>Operations</strong>, andJP 4-04, <strong>Joint</strong> <strong>Doctrine</strong> <strong>for</strong> Civil EngineeringSupport.11. Advanced BaseDevelopment and GarrisonPlansAdvanced base development and garrisonplanning is carried out in accordance withdirectives of the JFC or higher authority andresponds to requirements of the strategic plan.The CATF may be required to include in theplan provisions <strong>for</strong> initiation of civilengineering support.a. Advanced Base Development andGarrison Plans. Advanced basedevelopment and garrison plans are issuedseparately from plans <strong>for</strong> an amphibiousoperation. They are prepared by a level ofcommand higher than the amphibious <strong>for</strong>cecommander. Pertinent extracts may beincluded in the amphibious <strong>for</strong>ce plan.VIII-13
Chapter VIIIb. Planning Considerations. Preparationof advanced base development and garrisonplans are covered herein only as they influencethe planning <strong>for</strong> an amphibious operation.Because of the progressive nature of advancedbase development, which may commenceduring the action phase and continue long afterthe amphibious operation is completed, a highdegree of planning coordination must beachieved among the ATF, LF, logistic <strong>for</strong>ces,and other supporting <strong>for</strong>ces.c. Planning Responsibilities.• The CATF has planning responsibility <strong>for</strong>the following.•• Allocation of shipping from the ATFto lift advanced base development <strong>for</strong>ces.•• Embarkation and movement of <strong>for</strong>cesand equipment to the operational area.•• Allocation of means to control,support, and coordinate base and garrisonoperations during the amphibiousoperation.• The CLF is responsible <strong>for</strong> the followingduring planning.•• Plans to initiate advanced basedevelopment.•• Plans to coordinate, control, andsupport garrison operations ashore.•• Security measures.VIII-14JP 3-02
- Page 1 and 2:
Joint Publication 3-02Joint Doctrin
- Page 3 and 4:
PrefaceIntentionally BlankiiJP 3-02
- Page 5 and 6:
Table of Contents• Planning Direc
- Page 7 and 8:
Table of Contents• Intelligence E
- Page 9 and 10:
Table of ContentsIntentionally Blan
- Page 11 and 12:
Executive Summaryjoint environment.
- Page 13 and 14:
Executive SummaryIf organizing the
- Page 15 and 16:
Executive Summaryplanning aids, and
- Page 17 and 18:
Executive SummaryIntentionally Blan
- Page 19 and 20:
Chapter Iconcentrate forces and mak
- Page 21 and 22:
Chapter Ig. Some combat operations
- Page 23 and 24:
Chapter Ioperations and the vulnera
- Page 25 and 26:
Chapter Ib. Designation of required
- Page 27 and 28:
Chapter IIoperation and any develop
- Page 29 and 30:
Chapter II3122.01, Joint Operation
- Page 31 and 32:
Chapter IIdesignated in the order i
- Page 33 and 34:
Chapter II8. Amphibious Force TaskO
- Page 35 and 36:
Chapter IIupon termination of the a
- Page 37 and 38: Chapter IIICOMMAND AND CONTROLOF JO
- Page 39 and 40: Chapter IIIIII-4positive control me
- Page 41 and 42: Chapter IIIMarine TADC or Marine TA
- Page 43 and 44: Chapter IIICONCEPTUAL AMPHIBIOUS DE
- Page 45 and 46: Chapter IIIIntentionally BlankIII-1
- Page 47 and 48: Chapter IVcommanders to effectively
- Page 49 and 50: Chapter IVidentifying strengths and
- Page 51 and 52: Chapter IVthe beach, the transport
- Page 53 and 54: Chapter IV6. Crosstalks and Confirm
- Page 55 and 56: Chapter Vb. Detailed terrain and hy
- Page 57 and 58: Chapter VV-4understanding of the en
- Page 59 and 60: Chapter VIntentionally BlankV-6JP 3
- Page 61 and 62: Chapter VICOMMUNICATIONS SUPPORTREQ
- Page 63 and 64: Chapter VI• Acquisition and assig
- Page 65 and 66: Chapter VIIntentionally BlankVI-6JP
- Page 67 and 68: Chapter VIILand-based attack system
- Page 69 and 70: Chapter VIICommanders determine how
- Page 71 and 72: Chapter VIIb. Targeting. Targeting
- Page 73 and 74: Chapter VIIVII-8to the senior joint
- Page 75 and 76: Chapter VIId. Other Planning and Co
- Page 77 and 78: Chapter VIIIThe CATF is normally re
- Page 79 and 80: Chapter VIII• Character, size, an
- Page 81 and 82: Chapter VIIILogistic planning is ac
- Page 83 and 84: Chapter VIIICONTENTS OF THE HEALTHS
- Page 85 and 86: Chapter VIIILANDING FORCE HEALTHSER
- Page 87: Chapter VIIIBeach Group, and Marine
- Page 91 and 92: Chapter IXMinefields and obstacles
- Page 93 and 94: Chapter IXIX-4nonlethal fires, from
- Page 95 and 96: Chapter IXNUCLEAR, BIOLOGICAL, AND
- Page 97 and 98: Chapter IXIntentionally BlankIX-8JP
- Page 99 and 100: Chapter Xto permit initiation of pr
- Page 101 and 102: Chapter XI• Replenishment, repair
- Page 103 and 104: Chapter XIIntentionally BlankXI-4JP
- Page 105 and 106: Chapter XIIMateriel arriving from l
- Page 107 and 108: Chapter XIIXII-4•• Aircraft req
- Page 109 and 110: Chapter XII• Are clear of mines a
- Page 111 and 112: Chapter XII• Landing Craft Air Cu
- Page 113 and 114: Chapter XIIthe demonstration force
- Page 115 and 116: Chapter XIIIa. Supporting maritime
- Page 117 and 118: Chapter XIIIIntentionally BlankXIII
- Page 119 and 120: Chapter XIVTHE INVASION OF NORMANDY
- Page 121 and 122: Chapter XIVPLANNING SEQUENCELF sche
- Page 123 and 124: Chapter XIVOTH operations should ac
- Page 125 and 126: Chapter XIVand enemy situation allo
- Page 127 and 128: Chapter XVmaneuverability. This org
- Page 129 and 130: Chapter XVjustified only when such
- Page 131 and 132: Chapter XVc. Execution. The amphibi
- Page 133 and 134: Chapter XVAMPHIBIOUS OPERATIONS DUR
- Page 135 and 136: Chapter XVb. General. Rehearsals ar
- Page 137 and 138: Chapter XVXV-12TYPES OF MILITARYOPE
- Page 139 and 140:
Chapter XVIntentionally BlankXV-14J
- Page 141 and 142:
Appendix A21. JP 5-0, Doctrine for
- Page 143 and 144:
Appendix AIntentionally BlankA-4JP
- Page 145 and 146:
Appendix B5. Distributiona. Additio
- Page 147 and 148:
GlossaryDASCDCAD-dayDZEAEMCONEPWEWF
- Page 149 and 150:
GlossaryVLZVSWVTOLvertical landing
- Page 151 and 152:
Glossary(This term and its definiti
- Page 153 and 154:
Glossarymembers), resources, facili
- Page 155 and 156:
Glossarybefore, during, and after w
- Page 157 and 158:
Glossaryprotection to the task forc
- Page 159 and 160:
GlossaryIntentionally BlankGL-14JP