13.07.2015 Views

Alternative Construction Research Guide - GCCDS

Alternative Construction Research Guide - GCCDS

Alternative Construction Research Guide - GCCDS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1.3 | Kit Homesneeded to hoist pieces depending on the size of thosepieces.Specialized Labor: Plumbers and electricians areneeded to hook up the home. Some kit homes will comepre-wired, but most will not. Typically a kit home is designedto be assembled without specialized labor.Kit HomesOverview: A kit homes is a pre-designed house deliveredto site with all the pieces needed for the homeowner to complete the project. In some cases the interiorfinishes are not included in order to give the home ownera greater choice of finishes. Kit houses were popular atthe beginning of the 20th century when they could bepurchased out of catalogs like Sears Roebuck. 7 Today purchasingmaterials through mail-order has been replacedby the home construction mega-store. There are still kithomes available from different manufacturers. The fourmain types of kit homes are Log kits, Timber Frame kits(Post-and-Beam), Dome kits, and Panelized kits. Typicallythe pieces will be measured and cut or drilled to aid in theconstruction process.INSTALLATION<strong>Construction</strong> Process: Kit homes are often designed foreasy construction with power tools and basic skills. However,because each piece is pre-cut, there is little marginfor error during the construction process. Today, hiring acontractor to assemble a kit home is also a common option.(Fig.13) Sears sold mail order homes until the 1940s.Speed of <strong>Construction</strong>: Speed of constructiondepends on the type of kit and the size of the structuraland finishing materials it uses. The construction process issped up by having most of the materials on site. For somekits, experienced contractors can dry-in a home in about aweek after the foundation has been set. 8Delivery Method: Typically most of the needed materialfor construction will be brought to the site in a singledelivery. Instructions and any specialized tools should beincluded in this delivery.Required Equipment: Most kit homes will not needany unusual equipment. If any special tools are needed,they should be included in the kit. A crane might be(Fig.14) The kit home construction observed as part of this researchwas a Deltec home. All the materials for the structure and the weatherproofingare included in the kit, but interior finishes are not.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!