13.07.2015 Views

National Energy Policy - Final Draft - 14 Nov 2013

National Energy Policy - Final Draft - 14 Nov 2013

National Energy Policy - Final Draft - 14 Nov 2013

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6. Lack of a special purpose vehicle to spearhead exploration, assessment and development ofcoal resources.2.4.5 Coal Mid and Downstream DevelopmentThe Government is working with a strategic investor to build a coal fired power plant in Lamu Countyin the coastal region. Phase 1 of the plant will have a capacity of 960MW. Construction of the plantis expected to commence in 20<strong>14</strong> with a commissioning date of 2016. However, there is need todevelop adequate and appropriate coal handling and storage facilities onshore.2.4.5.1 Challenges in Coal Mid and Downstream1. Inadequate technical capacity for coal mid and downstream activities.2. Absence of a standard import and export coal handling facilities.3. Underdeveloped road and railway transportation system.4. Undeveloped processing facilities for coal.5. Insufficient power supply in the coal field.6. Undeveloped capacity to store and evacuate coal products.7. High initial cost of acquiring the necessary infrastructure.8. High transportation cost from the processor to end user.2.4.6 Policies and Strategies - Coal (Upstream, Midstream and Downstream)Policies and StrategiesCoalShort Term20<strong>14</strong>-20171. Develop local expertise and enhance local content in coal explorationand production through training and collaboration with explorationcompanies, training and research institutions.2. Create appropriate legal, fiscal and regulatory framework for coal exploration, exploitation and development3. Establish coal energy research centre within the national energy institute capable of handling coal analysis and other related studies.4. Adapt clean coal technology and provide appropriate fiscal incentives. 5. Create new coal exploration blocks based on technical data. 6. Enhance regional co-operation in data and information exchange for coalexploration.7. Kenya Railways Corporation and its concessionaires shall maximise the utilisation of rail transport for coal products.8. Establish a one-stop shop for coal licensing. Implementation PlanMedium Term20<strong>14</strong>-2022Long Term20<strong>14</strong>-20309. Enhance budgetary support for exploration and development of coalresources.41 2.0 – FOSSIL FUELS

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!